[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-732-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},732,"安全生产专业实务(原案例)","建筑工程",0,21,50,1210,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,297,309,321,333,345,357,369,381,392,404,416,428,440,452,464,476,488,500,512,523,531,543,555,567,579,587,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},997755,1,"单选题","施工现场配电线路包括室外线路和室内线路。下列不属于施工现场常见敷设方式的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","室外绝缘导线架空敷设",false,{"key":24,"text":25,"correct":26},"B","室外裸露导线埋地敷设",true,{"key":28,"text":29,"correct":22},"C","室内绝缘导线明敷",{"key":31,"text":32,"correct":22},"D","室内绝缘电缆暗敷","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},997756,"架空线路由导线、架空地线、绝缘子串、杆塔、接地装置等组成。施工现场的架空线路主要是低压架空线路。架空线必须采用绝缘导线。架空线导线截面的要求，下列说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"导线中的计算负荷电流不大于其长期连续负荷允许载流量",{"key":24,"text":41,"correct":22},"线路末端电压偏移不大于其额定电压的5％",{"key":28,"text":43,"correct":26},"线路的N线和PE线截面不小于相线截面的80％",{"key":31,"text":45,"correct":22},"单相线路的零线截面与相线截面相同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},997757,"下列关于架空线导线截面的要求说法中，错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"按机械强度要求，绝缘铜线截面最小10 mm2",{"key":24,"text":53,"correct":22},"按机械强度要求，绝缘铝线截面最小16 mm2",{"key":28,"text":55,"correct":22},"在跨越铁路、公路、河流、电力线路档距内，绝缘铜线截面最小16 mm2",{"key":31,"text":57,"correct":26},"在跨越铁路、公路、河流、电力线路档距内，绝缘铝线截面最小35 mm2",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},997758,"架空线路由导线、架空地线、绝缘子串、杆塔、接地装置等组成。施工现场的架空线路主要是低压架空线路。下列关于架空线路要求的说法中，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"架空线必须架设在专用电杆或树木上，严禁架设在脚手架及其他设施上",{"key":24,"text":65,"correct":22},"电杆埋深宜为杆长的1／10加0.6 m。在松软土质处宜加大埋人深度或采用卡盘等加固",{"key":28,"text":67,"correct":22},"动力、照明线在同一横担上架设时，导线相序排列是，面向负荷从左侧起依次为L1、N、L2、L3、PE",{"key":31,"text":69,"correct":22},"动力、照明线在二层横担上分别架设时，导线相序排列是．上层横担面向负荷从左侧起依次为L1、L2、L3，下层横担面向负荷从左侧起依次为L1(L2、L3)、N、PE",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},997759,"电缆线路的造价比架空线路高，但其不用架设杆塔，占地少，供电可靠，极少受外力破坏，对人身安全。下列关于电缆线路说法中，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"室外电缆的敷设分为埋地和架空两种方式，以埋地敷设为宜",{"key":24,"text":77,"correct":22},"电缆中必须包含全部工作芯线和用作保护零线或保护线的芯线",{"key":28,"text":79,"correct":22},"需要三相四线制配电的电缆线路必须采用五芯电缆",{"key":31,"text":81,"correct":26},"五芯电缆淡蓝色必须用作PE线，绿／黄双色芯线必须用作N线，严禁混用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},997760,"电缆线路采用埋地敷设时，应避免机械损伤和介质腐蚀，下列不符合电缆线路埋地敷设规定的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"埋地敷设宜选用铠装电缆，当选用无铠装电缆时，应能防水、防腐",{"key":24,"text":89,"correct":22},"电缆直接埋地敷设的深度不小于0．7 m，并应在电缆紧邻上、下、左、右侧均匀敷设不小于50 mm厚的细砂",{"key":28,"text":91,"correct":22},"埋地电缆在引出地面从2．0 m高到地下0．2 m处，必须加设防护套管．防护套管内径不应小于电缆外径的1．5倍",{"key":31,"text":93,"correct":26},"埋地电缆与其附近外电电缆和管沟的平行间距不得小于1 m，交叉间距不得小于0．5 m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},997761,"下列关于配电箱与开关箱的设置要求的说法中，说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"总配电箱应设在靠近电源的区域，分配电箱应设在用电设备或负荷相对集中的区域",{"key":24,"text":101,"correct":22},"分配电箱与开关箱的距离不得超过30 m，开关箱与其控制的固定用电设备的水平距离不宜超过3 m",{"key":28,"text":103,"correct":26},"配电箱、开关箱不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中，设置在热源烘烤的场所必须装设通风设备",{"key":31,"text":105,"correct":22},"配电箱、开关箱周围应由足够2人同时工作的空间和通道",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},997762,"配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作，钢板厚度应为1．2～2．0 mm。箱体表面应做防腐处理。下列关于配电箱与开关箱的构造要求说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"移动式配电箱、开关箱应装设在坚固的支架上",{"key":24,"text":113,"correct":22},"配电箱、开关箱内的电器(含插座)应先紧固在金属或非木质阻燃绝缘电器安装板上，金属电器安装板与金属箱体应做电气连接",{"key":28,"text":115,"correct":26},"配电箱的PE线端子板必须与金属电器安装板绝缘；N线端子板必须与金属电器安装板做电气连接",{"key":31,"text":117,"correct":22},"配电箱、开关箱内的连接线必须采用铜芯绝缘导线",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},997763,"配电箱的电器在总路和分路均应具备电源隔离，正常接通与分断电路，以及短路、过载、漏电保护功能。下列关于配电箱电源隔离设备的说法中，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"当总路设置的总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时，可不设总断路器或总熔断器",{"key":24,"text":125,"correct":22},"当总路设置的总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时，仍应设总断路器或总熔断器",{"key":28,"text":127,"correct":22},"当分路设置分路漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时，可不设总路断路器或总路熔断器",{"key":31,"text":129,"correct":22},"当分路设置分路漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时，仍应设分路断路器或分路熔断器",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},997764,"下列关于配电箱和开关箱电器选择的说法中，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"总配电箱应装设电压表、总电流表、电度表等",{"key":24,"text":137,"correct":22},"总开关器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应",{"key":28,"text":139,"correct":22},"隔离开关采用分断时具有可见分断点的断路器，可不另设隔离开关",{"key":31,"text":141,"correct":26},"隔离开关应设置于电源出线端，且采用分断时具有可见分断点，并能同时断开电源所有极的隔离电器",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},997765,"施工现场的照明为了从技术上保证现场工作人员免受发生在照明装置上的触电伤害，照明装置必须采取如下技术措施。下列关于施工现场照明的说法中错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"照明开关箱中的所有正常不带电的金属部件(除N线端子板)都必须做保护接零；所有灯具的金属外壳必须做保护接零",{"key":24,"text":149,"correct":22},"照明开关箱(板)应装设漏电保护器",{"key":28,"text":151,"correct":26},"照明线路的开关既可安装在相线中，也可安装在工作零线中",{"key":31,"text":153,"correct":22},"室外灯具具地不得低于3 m；室内灯具距地不得低于2．5 m",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},997766,"塔式起重机应按规定要求做重复接地和防雷接地。下列关于轨道式塔式起重机接地装置的设置应不符合要求的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"较短轨道可在其轨道一端设一组接地装置",{"key":24,"text":161,"correct":22},"轨道的接头处作电气连接，两条轨道端部作环形电气连接",{"key":28,"text":163,"correct":22},"较长轨道每隔不大于30 m加一组接地装置",{"key":31,"text":165,"correct":22},"在强电磁波源附近工作的塔式起重机，操作人员应戴绝缘手套和穿绝缘鞋，并应在吊钩吊装地面物体时，在吊钩上挂接临时接地装置",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},997767,"下列关于焊接机械的现场临时用电要求中，错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"焊接现场不得有易燃易爆物品",{"key":24,"text":173,"correct":22},"交流弧焊机变压器的一次侧电源线长度不应大于5 m",{"key":28,"text":175,"correct":22},"交流电焊机械应配装防二次侧触电保护器",{"key":31,"text":177,"correct":26},"可采用金属构件或结构钢筋代替二次线的地线",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},997768,"下列关于临时用电施工组织设计的要求中，说法错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"临时用电工程图纸应与主体工程图纸一同绘制，临时用电工程应按图施工",{"key":24,"text":185,"correct":22},"临时用电施工组织设计及变更必须履行“编制、审核、批准”程序",{"key":28,"text":187,"correct":22},"临时用电工程必须经编制、审核、批准部门和使用单位共同验收，合格后方可投入使用",{"key":31,"text":189,"correct":22},"对于小型工地(现场临时用电设备5台以下或者设备总容量在50 kW以下)，可不编制临时用电施工组织设计，但仍要编制安全用电措施和电器防火措施，并且履行“编制、审核、批准、验收”的管理程序",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},997769,"施工现场应加强临时用电管理，明确专门的电气技术人员，组织临时用电工程的定期检查，并履行复查验收手续。下列关于临时用电安全管理的说法中，错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"施工现场安装、巡检、维修或拆除临时用电设备和线路，必须由电工完成，并应有人监护",{"key":24,"text":197,"correct":22},"电工必须经过按国家现行标准考核合格后，持证上岗工作，严禁非电工人员从事电工工作",{"key":28,"text":199,"correct":26},"使用电气设备必须由电工操作，并按规定穿戴和配备好相应的劳动防护用品",{"key":31,"text":201,"correct":22},"移动电气设备时，必须经电工切断电源并做妥善处理后进行",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},997770,"在建工程的周边与外电架空线路的边线之间应符合安全操作距离。现场有一脚手架，其临近外电架空线路为10 kV高压线路，脚手架与外电架空线路的安全距离为（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"2 m",{"key":24,"text":209,"correct":22},"4 m",{"key":28,"text":211,"correct":26},"6 m",{"key":31,"text":213,"correct":22},"8 m",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},997771,"施工现场的一台塔式起重机与10 kV外架空线路临近，其沿水平方向的最小安全距离为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"0．5 m",{"key":24,"text":221,"correct":22},"1 m",{"key":28,"text":223,"correct":22},"1．5 m",{"key":31,"text":207,"correct":26},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},997772,"当施工现场与周边架空线路不能保证最小安全距离时，为了确保施工安全，则必须采取设置防护性遮栏、栅栏以及悬挂警告标志牌等防护措施。下列搭设防护屏障的措施中错误的是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"防护遮栏、栅栏的搭设应使用钢管脚手架杆",{"key":24,"text":232,"correct":22},"搭设防护遮栏、栅栏应有足够的机构强度",{"key":28,"text":234,"correct":22},"搭设和拆除时应停电作业",{"key":31,"text":236,"correct":22},"无法设置遮栏时则应采取停电、迁移外电线路或改变工程位置等",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},997773,"TN系统中在工作接地以外，在专用保护线PE上一处或多出再次与接地装置相连称为重复接地。当系统中发生碰壳或接地短路时．可降低零线的对地电压，当零线发生断裂时，可使故障程度减轻。下列关于重复接地的要求中，错误的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"TN系统中的保护零线必须在配电室或总配电箱处做重复接地外",{"key":24,"text":244,"correct":22},"TN系统中的保护零线必须在配电系统的末端处做重复接地",{"key":28,"text":246,"correct":26},"TN系统中的保护零线在配电室或总配电箱处和配电系统的末端处已做重复接地，可不在配电系统的中间处做重复接地",{"key":31,"text":248,"correct":22},"在TN系统中，保护零线每一处重复接地装置的接地电阻值不应大于10Ω",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},997774,"通常配电室的选择应根据现场负荷的类型、大小和分布特点、环境特征等进行全面考虑，下列关于配电室布置的说法中，正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":26},"应设在灰尘少、潮气少、振动小、无腐蚀介质、无易燃易爆物及道路畅通的地方",{"key":24,"text":256,"correct":22},"配电室的建筑结构和构筑物的耐火等级不低于1级，室内配置砂箱和可用于扑灭电气火灾的灭火器",{"key":28,"text":258,"correct":22},"配电室的门向内开，并配锁",{"key":31,"text":260,"correct":22},"配电室的照明可只设置正常照明",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},997775,"为了保证施工不因停电而中断，有的施工现场备有发动机组，作为外线电路停止供电时的接续供电电源，这就是自备电源。下列关于自备发配电系统的规定，错误的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":26},"发电机组电源必须与外电线路电源连锁，并设置同期装置，在同步运行后方可并列运行",{"key":24,"text":268,"correct":22},"发电机组并列运行时，必须装设同期装置，并在机组同步运行后再向负载供电",{"key":28,"text":270,"correct":22},"电源隔离开关分断时应由明显可见分断点",{"key":31,"text":272,"correct":22},"发电机供电系统应设置电源隔离开关及短路、过载、漏电保护电器",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},997776,"施工现场在特殊场所使用的照明器应使用安全电压，下列关于施工现场照明使用的安全电压值描述正确的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"隧道、人防工程、高温、有导电灰尘或灯具离地面高度低于2．5 m等场所的照明，电源电压不应大于24 V",{"key":24,"text":280,"correct":22},"在潮湿和易触及带电体场所的照明电源电压不得大于36 V",{"key":28,"text":282,"correct":22},"在特别潮湿的场所、导电良好的地面、锅炉或金属容器内工作的照明．电源电压不得大于6 V",{"key":31,"text":284,"correct":26},"移动式照明器(如行灯)的照明电源电压不得大于36 V",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},997777,"电气设备的外壳防护等级用“IP+数字+数字”表示。下列对标志含义的解释中，正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"“IP45”表示“防止工具接近危险部件，防止直径不小于2．5 mm固体异物：防喷水”",{"key":24,"text":292,"correct":26},"“IP34”表示“防止工具接近危险部件，防止直径不小于2．5mm 固体异物：防淋水”",{"key":28,"text":294,"correct":22},"“IP65”表示“防止直径不小于1．0 mm的金属线接近危险部件。尘密：防短时间浸水”",{"key":31,"text":296,"correct":22},"“IP51”表示“防止直径不小于1．0 mm的金属线接近危险部件，防尘：防止垂直方向滴水”",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},997778,"接地装置包括埋人土中的接地体，接地体可分为自然接地体和人工接地体两类。下列不属于自然接地体的是（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"埋在地下的金属自来水管",{"key":24,"text":304,"correct":26},"埋在地下的金属燃气管道",{"key":28,"text":306,"correct":22},"建筑物和构筑物与大地接触的或水下的金属结构",{"key":31,"text":308,"correct":22},"建筑物的钢筋混凝土基础等",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},997779,"下列关于配电室布置要求的说法中，正确的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"配电柜正面的操作宽度，单列布置或双列背对背布置不小于2 m，双列面对面布置不小于2．5 m",{"key":24,"text":316,"correct":22},"配电柜后面的维护通道宽度，单列布置或双列面对面布置不小于1．5 m．双列背对背布置不小于2 m",{"key":28,"text":318,"correct":22},"配电柜侧面的维护通道宽度不小于2 m，配电室的顶棚与地面的距离不低于2．5 m",{"key":31,"text":320,"correct":26},"配电室内的裸母线与地面垂直距离小于2．5 m时，采用遮栏隔离。遮栏下面通道的宽度不小于1.9 m",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},997780,"室内配线必须采用绝缘导线或电缆。室内配线应根据配线类型采用瓷瓶、瓷(塑料)夹、嵌绝缘槽、穿管或钢索敷设。下列关于室内配线不符合规定的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"当采用金属管敷设时，金属管必须做等电位连接，且必须与PE线相连接",{"key":24,"text":328,"correct":22},"室内非埋地明敷主干线距地面高度不得小于2．5 m",{"key":28,"text":330,"correct":22},"架空进户线的距地面高度不得小于2．5 m，并应采取防雨措施",{"key":31,"text":332,"correct":26},"室内配线所用导线或电缆的铜线截面不应小于1．5 mm2，铝线截面不应小于2 mm2",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},997781,"手持电动工具的防触电保护可分为3类，各类手持电动工具使用时对附加安全措施的装接要求不同。下列关于手持电动工具装接保护接地的说法中，正确的是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"Ⅰ类设备可以装接保护接地，也可不装接保护接地",{"key":24,"text":340,"correct":22},"Ⅰ类设备不允许装接保护接地",{"key":28,"text":342,"correct":22},"Ⅲ类设备必须装接保护接地",{"key":31,"text":344,"correct":26},"Ⅲ类设备不须要装接保护接地",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},997782,"关于手持电动工具的安全使用要求，下列叙述正确的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"空气湿度小于75％的一般场所可选用Ⅱ类手持式电动工具，但不能选用Ⅰ类手持式电动工具",{"key":24,"text":352,"correct":22},"在潮湿场所或金属架上操作时，必须选用由安全隔离变压器供电的Ⅲ类手持式电动工具，但不能选用Ⅱ类手持式电动工具",{"key":28,"text":354,"correct":22},"狭窄场所必须选用Ⅱ类手持式电动工具。操作过程中，应有专人在外面监护",{"key":31,"text":356,"correct":26},"手持式电动工具的负荷线应采用耐气候性的橡皮护套铜芯软电缆，并不得有接头",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},997783,"凡在坠落高度基准面2m以上(含2m)有可能坠落的高处进行的作业称为高处作业。高处作业高度计算方法示例如下图所示应为（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"20m",{"key":24,"text":364,"correct":26},"14m",{"key":28,"text":366,"correct":22},"6m",{"key":31,"text":368,"correct":22},"5．5m",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},997784,"作业高度分为2～5m，5～15m，15～30m及>30m四个区域。这四个区域被称为（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"一级高处作业、二级高处作业、三级高处作业、四级高处作业",{"key":24,"text":376,"correct":26},"一级高处作业、二级高处作业、三级高处作业、特级高处作业",{"key":28,"text":378,"correct":22},"A级高处作业、8级高处作业、C级高处作业、D级高处作业",{"key":31,"text":380,"correct":22},"Ⅰ级高处作业、Ⅱ级高处作业、Ⅲ级高处作业、Ⅳ级高处作业",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},997785,"作业高度为10m时，属于二级高处作业，其坠落半径在计算时取值为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"3m",{"key":24,"text":388,"correct":26},"4m",{"key":28,"text":390,"correct":22},"5m",{"key":31,"text":366,"correct":22},{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},997786,"高处作业分为特殊高处作业(B类)和一般高处作业(A类)。下列不属于特殊高处作业类别(B类)的是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"风力四级情况下进行的高处作业",{"key":24,"text":399,"correct":22},"在降雪时进行的雪天高处作业",{"key":28,"text":401,"correct":22},"在降雨时进行的雨天高处作业",{"key":31,"text":403,"correct":22},"在无立足点或无牢靠立足点的条件下进行的悬空高处作业",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},997787,"下列属于直接引起坠落的客观危险因素为（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"阵风风力四级以上",{"key":24,"text":411,"correct":22},"平均气温10℃",{"key":28,"text":413,"correct":26},"作业场地有水",{"key":31,"text":415,"correct":22},"空气中存在有易燃气体",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},997788,"地下消火栓、市政管道、集水坑等井15也应做防护栏杆防护措施，关于其防护栏杆设置的要求中，错误的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"井口四周采用工具式定型防护栏杆，防护栏杆长度为1200mm，高度为1200mm",{"key":24,"text":423,"correct":22},"井口上方设置盖板。盖板应大于井口边缘100mm",{"key":28,"text":425,"correct":22},"工具式定型防护栏杆距盖板边缘不小于100mm",{"key":31,"text":427,"correct":22},"井口周边须设置夜间安全警示灯，灯柱高度为2500mm",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},997789,"在建筑施工中，高处作业主要有临边作业、洞口作业、悬空作业、交叉作业、攀登作业等，进行高处作业时必须做好必要的安全防护措施。在施工现场，当工作面的边沿并无维护设施，使人与物有各种坠落可能的高处作业，属于（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"临边作业",{"key":24,"text":435,"correct":22},"洞口作业",{"key":28,"text":437,"correct":22},"悬空作业",{"key":31,"text":439,"correct":22},"攀登作业",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},997790,"在施工现场，当工作面的边沿并无维护设施，使人与物有各种坠落可能的高处作业，属于临边作业，下列作业要求中，描述错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"进行临边作业时，应在临空一侧设置防护栏杆，并应采用密目式安全立网或工具式栏板封闭",{"key":24,"text":447,"correct":22},"分层施工的楼梯口、楼梯平台和梯段边，应安装防护栏杆，还应采用密目式安全立网封闭",{"key":28,"text":449,"correct":26},"建筑物外围边沿处，应采用密目式安全立网全封闭，有外脚手架的工程，密目式安全立网将临边半封闭",{"key":31,"text":451,"correct":22},"施工升降机、龙门架和井架物料提升机等垂直运输设备设施与建筑物间设置的通道平台两侧边，应设置防护栏杆、挡脚板，并应采用密目式安全立网或工具式栏板封闭",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},997791,"建筑物或构筑物在施工过程中，常会出现各种预留洞口、通道口、上料口、楼梯口、电梯井口，在其附近工作，称为洞口作业。下列关于水平洞口防护的说法中，错误的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"当洞口短边边长为25～500mm时，应采用盖板覆盖",{"key":24,"text":459,"correct":22},"当洞口短边边长为500～1500mm时，应采用盖板覆盖或防护栏杆",{"key":28,"text":461,"correct":26},"当洞口短边边长大于或等于1500mm时，应采用盖板覆盖或防护栏杆。采用防护栏时洞口应采用安全平网封闭",{"key":31,"text":463,"correct":22},"洞口盖板应能承受不小于1kN的集中荷载和不小2kN／m2的均布荷载，有特殊要求的盖板应另行设计",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},997792,"水平洞口中的采光井的防护栏杆应采用φ48．3mm×3．6mm钢管，50mm厚脚手板。下列关于采光井防护栏杆的要求中，说法正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"立杆高度1200mm，防护栏杆距洞口边不小于200mm",{"key":24,"text":471,"correct":22},"洞口四周用钢管搭设三道防护栏杆，第一道栏杆距离地面1400mm，第二道栏杆距地面800mm．第三道栏杆距地面400mm",{"key":28,"text":473,"correct":22},"洞口尺寸大于2000mm时，立杆间距不大于1500mm",{"key":31,"text":475,"correct":26},"在第一道防护栏杆的上部铺满脚手板；栏杆的下部设置高200mm的木质挡脚板",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},997793,"下列关于竖向洞口防护措施的说法中，正确的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"当竖向空口的短边边长小于1200mm时，应采取封堵措施",{"key":24,"text":483,"correct":22},"当垂直洞口短边边长大于或等于1200mm时，应在临空一侧设置高度不低于1500mm防护栏杆，并应采用密目式安全立网或工具式栏板封闭，设置挡脚板",{"key":28,"text":485,"correct":26},"竖向结构高度大于等于600mm且小于1200mm的预留洞口，应设置1200mm高的防护栏杆",{"key":31,"text":487,"correct":22},"竖向结构高度大于等于600mm且小于1200mm的预留洞口，应在距地面不高于20mm处设置一道防护栏杆",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},997794,"下列关于电梯井的防护措施中，说法正确的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"电梯井首层应设置一层水平安全网",{"key":24,"text":495,"correct":22},"施工层及其他每隔三层且不大于10m设一道水平安全网",{"key":28,"text":497,"correct":26},"施工层的下一层的井道内设置一道硬质隔断以防物件掉落",{"key":31,"text":499,"correct":22},"施工层的下一层的勾头螺栓上架设两根横向钢管，两根纵向钢管，并在钢管框架上满铺脚手板",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},997796,"悬空高处作业人员应系挂安全带、佩戴工具袋。严禁在未固定、无防护的构件及安装中的管道上作业或通行。下列关于悬空作业的要求中，错误的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"模板支撑应按规定的程序进行，不得在连接件和支撑杆件上攀登上下，在上下同一垂直面上装拆模板时应采取安全防护措施",{"key":24,"text":507,"correct":22},"绑扎立柱和墙体钢筋。不得站在钢筋骨架上或攀登骨架",{"key":28,"text":509,"correct":22},"悬挑的混凝土梁和檐、外墙和边柱等结构施工时，应搭设脚手架或操作平台，并应设置防护栏杆，采用密目式安全立网封闭",{"key":31,"text":511,"correct":22},"在坡度大于1：2．2的屋面上作业，当无外脚手架时，应在屋檐边设置不低于1．5m高的防护栏杆，并应采用密目式安全立网全封闭",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},997797,"高处绑扎柱钢筋超出要求的高度时，应设置操作平台。设置操作平台的高度为（ ）以上。",[516,518,519,521],{"key":20,"text":517,"correct":26},"2m",{"key":24,"text":390,"correct":22},{"key":28,"text":520,"correct":22},"8m",{"key":31,"text":522,"correct":22},"10m",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},997798,"浇筑混凝土结构构件超出要求的高度时，应设置操作平台。设置操作平台的高度为（ ）以上。",[527,528,529,530],{"key":20,"text":517,"correct":26},{"key":24,"text":390,"correct":22},{"key":28,"text":520,"correct":22},{"key":31,"text":522,"correct":22},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":31,"analysis":33},997799,"在无立足点或无牢靠立足点的条件下，进行的高处作业统称为悬空高处作业。因此必须适当建立牢固的立足点，如搭设操作平台、脚手架或吊篮等。构件吊装和管道安装时的悬空高处作业应符合规定，下列说法中错误的是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"钢结构吊装，构件宜在地面组装，安全设施应一并设置",{"key":24,"text":538,"correct":22},"吊装时．应在作业层下方设置水平安全网",{"key":28,"text":540,"correct":22},"吊装钢筋混凝土屋架、梁、柱等大型构件前，应在构件上预先设置登高通道、操作立足点等安全设施",{"key":31,"text":542,"correct":26},"钢结构安装施工宜在施工层搭设水平通道，当利用钢梁作为水平通道时，应在钢梁一侧设置连续的防护栏杆",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},997800,"在施工现场，借助于登高用具或登高设施，在攀登条件下进行的高处作业，叫攀登作业。现场登高除借助建筑结构及脚手架设置的登高设施(如马道)外，也可使用梯子或其他攀登设施。下列关于攀登作业的注意事项中，说法正确的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"两人同时在梯子上作业，应由专人监护或设置围栏",{"key":24,"text":550,"correct":22},"脚手架操作层上使用梯子作业，应设置操作平台",{"key":28,"text":552,"correct":22},"梯子接长使用，接头不得超过2处，连接可靠",{"key":31,"text":554,"correct":26},"使用直梯时底部应坚实，不得垫高使用",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},997801,"下列关于攀登作业的注意事项中，说法错误的是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"使用固定式直梯进行攀登作业时，攀登高度不超过10m",{"key":24,"text":562,"correct":26},"使用固定式直梯进行攀登作业时，超过5m时必须设置梯间平台",{"key":28,"text":564,"correct":22},"钢结构安装时的攀登作业，无电焊防风要求的操作平台防护栏杆高度不应小于1．2m",{"key":31,"text":566,"correct":22},"钢结构安装时的攀登作业，有电焊防风要求的操作平台防护栏杆高度不应小于1．8m",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":28,"analysis":33},997802,"深基坑施工，应设置扶梯、入坑踏步及专用载人设备或斜道等，严禁沿坑壁、支撑或乘运土工具上下。扶梯踏步间距不应大于（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":22},"200mm",{"key":24,"text":574,"correct":22},"300mm",{"key":28,"text":576,"correct":26},"400mm",{"key":31,"text":578,"correct":22},"500mm",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},997803,"深基坑施工，应设置扶梯、入坑踏步及专用载人设备或斜道等，严禁沿坑壁、支撑或乘运土工具上下。采用斜道时，应加设防滑条等防滑措施，防滑条间距不应大于（ ）。",[583,584,585,586],{"key":20,"text":572,"correct":22},{"key":24,"text":574,"correct":22},{"key":28,"text":576,"correct":26},{"key":31,"text":578,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},997804,"在建筑施工中，高处作业主要有临边作业、洞口作业、悬空作业、交叉作业、攀登作业等，进行高处作业时必须做好必要的安全防护措施。施工现场，在无立足点或无牢靠立足点的条件下，进行的高处作业称为（ ）。",[591,592,593,594],{"key":20,"text":433,"correct":22},{"key":24,"text":435,"correct":22},{"key":28,"text":437,"correct":26},{"key":31,"text":439,"correct":22},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":28,"analysis":33},997805,"当吊装作业利用吊车梁等构件作为水平通道时，临空面的一侧应设置连续的栏杆等防护措施。当采用钢索做安全绳时，钢索的一端应采用花篮螺栓收紧；当采用钢丝绳作安全绳时，绳的自然下垂度不应大于绳长的1／20，并不应大于（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"50m",{"key":24,"text":602,"correct":22},"80m",{"key":28,"text":604,"correct":26},"100m",{"key":31,"text":606,"correct":22},"150m",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]