[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-732-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},732,"安全生产专业实务(原案例)","建筑工程",0,19,50,1210,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,415,427,439,451,462,474,486,498,510,520,532,544,556,568,578,590,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},997654,1,"单选题","下列关于可燃固体燃烧过程的叙述中，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","硫、磷等单体物质，受热时首先熔化，而后蒸发为蒸气进行燃烧",true,{"key":24,"text":25,"correct":26},"B","硫、磷等单体物质，受热时熔化，而后燃烧",false,{"key":28,"text":29,"correct":26},"C","复合物质必须受热分解成单体物质后才能发生燃烧",{"key":31,"text":32,"correct":26},"D","点燃固体可燃物质所需要的热量只用于本身的融化分解","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},997655,"（ ）是企业安全生产管理层的重要角色，更是施工现场承担安全生产的第一责任人，对施工现场安全生产管理负总责，是施工现场安全生产管理的决策人物。",[38,40,42,44],{"key":20,"text":39,"correct":26},"企业法定代表人",{"key":24,"text":41,"correct":26},"企业安全总监",{"key":28,"text":43,"correct":22},"项目经理",{"key":31,"text":45,"correct":26},"企业安全生产管理负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},997656,"下列有关建筑行业自身特点对安全生产不利客观因素的说法中正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"施工人员的不安全行为是导致意外伤害事故造成损害的间接原因",{"key":24,"text":53,"correct":22},"项目施工人员在面对具体的生产问题时，仍旧需要依靠自己的判断和决定",{"key":28,"text":55,"correct":26},"同一个建设项目在不同的建设阶段所面临的风险基本相同",{"key":31,"text":57,"correct":26},"不同的建设项目所面临的事故风险的多少和种类都是相同的",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},997657,"建筑施工企业和施工现场都应该建立相应的安全生产管理体系，下列关于安全生产管理体系的说法中正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"建筑施工企业的管理层次一般可分为决策层、管理层和操作层，与之对应的分别是总公司、分公司、施工项目部",{"key":24,"text":65,"correct":26},"在建筑施工领域，企业决策层安全生产管理的主要负责人，包括企业法定代表人、经理、企业分管生产和安全的副经理、安全总监及技术负责人、项目经理等",{"key":28,"text":67,"correct":26},"公司安全总监是施工现场承担安全生产的第一责任人，是施工现场安全生产管理的决策人物",{"key":31,"text":69,"correct":22},"在建筑施工企业，专职从事安全生产管理工作的人员，包括企业安全生产管理机构的负责人及其工作人员、施工现场专职安全生产管理人员，是企业操作层的安全生产管理负责人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},997658,"根据近年来房屋和市政工程事故类型和群死群伤事故统计，目前我国发生总体事故次数最多的事故类型和发生群死群伤事故次数最多的事故类型分别是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"土方坍塌和高处坠落",{"key":24,"text":77,"correct":26},"土方坍塌和起重伤害",{"key":28,"text":79,"correct":26},"起重伤害和物体打击",{"key":31,"text":81,"correct":22},"高处坠落和土方坍塌",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},997659,"建筑施工生产安全事故类型描述错误的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"依据事故类型的统计，建筑施工前五类安全事故类型是高处坠落、物体打击、坍塌、起重伤害、机械伤害",{"key":24,"text":89,"correct":22},"依据事故类型的统计，建筑施工前五类安全事故类型是高处坠落、物体打击、坍塌、触电、机械伤害",{"key":28,"text":91,"correct":26},"高处坠落在世界范围内都位居建筑业伤亡事故的首位",{"key":31,"text":93,"correct":26},"依据群死群伤的事故类型的统计，建筑施工前五类安全事故类型是土方坍塌、起重伤害、模板支撑体系坍塌、吊篮倾覆、中毒和窒息",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},997660,"依据事故类型的统计，不属于建筑施工前五类安全事故类型的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"高处坠落",{"key":24,"text":101,"correct":26},"物体打击",{"key":28,"text":103,"correct":22},"火灾",{"key":31,"text":105,"correct":26},"机械伤害",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},997661,"根据发生生产安全事故可能产生的后果，《建筑施工安全技术统一规范》（GB 50870)将建筑施工危险等级划分为I、II、III级。其中危险等级为I级的危险等级系数是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"1.00",{"key":24,"text":113,"correct":26},"1.05",{"key":28,"text":115,"correct":22},"1.10",{"key":31,"text":117,"correct":26},"1.02",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},997662,"建筑施工企业对施工现场重大危险源辨识后，要及时登记建档。重大危险源档案应不包括的内容是（ ）.",[122,124,126,128],{"key":20,"text":123,"correct":26},"分布区域与警示布置",{"key":24,"text":125,"correct":26},"监控记录",{"key":28,"text":127,"correct":22},"安全监控责任人",{"key":31,"text":129,"correct":26},"识别评价记录",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},997663,"根据《安全生产法》（ ）对重大危险源应当登记建档，进行定期检测、评估、监控，并制定应急预案，告知从业人员和相关人员在紧急情况下应当采取的应急措施。",[134,136,138,140],{"key":20,"text":135,"correct":26},"施工单位",{"key":24,"text":137,"correct":22},"生产经营单位",{"key":28,"text":139,"correct":26},"总包单位",{"key":31,"text":141,"correct":26},"建设单位",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},997664,"关于建筑施工危险等级划分的描述中正确的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"根据建筑施工生产安全事故可能产生的后果，将建筑施工危险等级划分为四个级",{"key":24,"text":149,"correct":26},"事故后果“特别严重”的危险等级系数为“1．10”",{"key":28,"text":151,"correct":22},"事故后果“严重”的危险等级系数为“1．05”",{"key":31,"text":153,"correct":26},"事故后果“较严重”的危险等级系数为“1．00”",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},997665,"下列关于施工组织设计说法错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"单位工程施工组织设计是以单位（子单位）工程为对象编制的施工组织设计，由项目技术负责人审批",{"key":24,"text":161,"correct":26},"施工方案是以分部（分项）工程或专项工程为主要对象编制的施工技术与组织方案",{"key":28,"text":163,"correct":26},"施工组织设计的编制要与质量、环境和职业健康安全三个管理体系有效结合",{"key":31,"text":165,"correct":26},"施工组织设计编制时要依据工程施工合同或招标投标文件结合施工企业的生产能力、机具设备状况、技术水平等等情况进行编制",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},997666,"施工组织设计是以施工项目为对象编制的，用以指导施工的技术、经济和管理的综合性、纲领性文件，是施工单位在施工前对现场设施的布置和建设作出的规划。下列关于施工组织设计描述中错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"施工组织设计按编制对象一般分为施工组织总设计、单位工程施工组织设计和施工方案三类",{"key":24,"text":173,"correct":26},"施工组织总设计是以若干单位工程组成的群体工程或特大型项目为主要对象编制的施工组织设计，对整个项目的施工过程起统筹规划、重点控制的作用",{"key":28,"text":175,"correct":22},"单位工程施工组织设计是在群体工程项目中，以单位(子单位)工程为对象编制的施工组织设计，对单位(子单位)工程的施工过程起到指导和制约作用，也是编制施工组织总设计的基础",{"key":31,"text":177,"correct":26},"施工方案是以分部(分项)工程或专项工程为主要对象编制的施工技术与组织方案，用以具体指导其施工过程",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},997667,"不符合施工组织设计编制原则的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"符合施工合同或招标文件中有关工程进度、质量、安全、环境保护、造价等方面的要求",{"key":24,"text":185,"correct":22},"不使用新技术、新工艺、新材料和新设备",{"key":28,"text":187,"correct":26},"坚持科学的施工程序和合理的施工顺序，采取季节性施工措施",{"key":31,"text":189,"correct":26},"采取技术和管理措施，推广建筑节能和绿色施工",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},997668,"下列关于施工组织设计的编制和审批流程的描述中，错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"施工组织设计应由施工单位组织编制，不可分段编制和审批",{"key":24,"text":197,"correct":26},"施工组织总设计应由总承包单位技术负责人审批",{"key":28,"text":199,"correct":26},"单位工程施工组织设计应由施工单位技术负责人或技术负责人授权的技术人员审批",{"key":31,"text":201,"correct":26},"施工方案应由项目技术负责人审批",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},997669,"下列不属于塔式起重机安全防护装置的是（)",[206,208,210,212],{"key":20,"text":207,"correct":26},"限位开关（器）",{"key":24,"text":209,"correct":26},"钢丝绳防脱装置",{"key":28,"text":211,"correct":26},"风速计",{"key":31,"text":213,"correct":22},"驱动装置",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},997670,"下列关于塔式起重机安全操作要求做法错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"用限位装置代替操纵机构",{"key":24,"text":221,"correct":26},"钢丝绳与物件的夹角宜为 45°~60°，且不得小于 30°",{"key":28,"text":223,"correct":26},"作业完毕后，应松开回转制动器，各部件应置于非工作状态，控制开关应置于零位，并应切断总电源",{"key":31,"text":225,"correct":26},"在吊物荷载达到额定载荷的 90％时，应先将吊物吊离地面 200~500mm 后，检查机械状况、制动性能、物件绑扎情况等，确认无误后方可起吊",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},997671,"下列不属于施工升降机安全装置中安全开关的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"超载保护开关",{"key":24,"text":233,"correct":26},"限位保护开关",{"key":28,"text":235,"correct":26},"限速保护开关",{"key":31,"text":237,"correct":26},"防冲顶限位开关",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},997672,"下列不属于物料提升机安全保护装置的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"通信信号装置",{"key":24,"text":245,"correct":26},"载重量限制装置",{"key":28,"text":247,"correct":26},"缓冲器",{"key":31,"text":249,"correct":22},"传动机构",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},997673,"某项目需要用两台汽车起重机共同抬吊同一货物，则下列关于汽车起重机使用做法错误的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"支腿靠近地基挖方地段时必须给支腿垫好能承载的木板或木块",{"key":24,"text":257,"correct":26},"在起重机作业中禁止断开全自动超重防止装置（ACS 系统）",{"key":28,"text":259,"correct":26},"两台起重机性能、速度应相同，各自分担的载荷值，应小于一台起重机的额定总起重量的 80%",{"key":31,"text":261,"correct":26},"禁止在自由下落中紧急制动",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},997674,"塔式起重机的主参数是（ ）",[266,268,270,272],{"key":20,"text":267,"correct":26},"最大起重量",{"key":24,"text":269,"correct":22},"最大额定起重力矩",{"key":28,"text":271,"correct":26},"最大工作幅度",{"key":31,"text":273,"correct":26},"最大起升高度",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},997675,"下列满足塔式起重机正常使用条件的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"工作环境温度 42℃",{"key":24,"text":281,"correct":26},"安装架设时塔式起重机顶部 3s 时距平均瞬时风速 15m\u002Fs",{"key":28,"text":283,"correct":22},"工作状态时塔式起重机顶部 3s 时距平均瞬时风速 18m\u002Fs",{"key":31,"text":285,"correct":26},"海拔高度 1200m",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":28,"analysis":33},997676,"下列关于施工升降机安全使用做法错误的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"每班首次运行时，必须空载及满载运行，梯笼升离地面 1m 左右停车，检查制动器灵敏性，然后继续上行楼层平台，检查安全防护门、上限位、前后门限位，确认正常方可投入运行",{"key":24,"text":293,"correct":26},"作业后，将梯笼降到底层，各控制开关扳至零位，切断电源，锁好闸箱和梯门",{"key":28,"text":295,"correct":22},"楼层平台安全防护门必须向外开启设计，乘坐人员卸货后必须插好安全防护门",{"key":31,"text":297,"correct":26},"乘坐人员不得在梯笼运行过程中将手指或杂物从梯笼门缝隙伸到外边",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},997677,"下列关于物料提升机构造使用做法错误的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"缆风绳与地面的夹角不应大于 60°，应以 45°~60°为宜",{"key":24,"text":305,"correct":26},"吊笼（吊篮）的两侧应设置高度不小于 100cm 的安全挡板",{"key":28,"text":307,"correct":22},"缆风绳的一端应连接在架体上，另一端应固定在脚手架上且必须进行设计计算",{"key":31,"text":309,"correct":26},"附墙架的设置应符合设计要求，其间隔不宜大于 9m，且在建筑物的顶层宜设置 1 组，附墙后立柱顶部的自由高度不宜大于 6m",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},997678,"下列关于汽车起重机安全装置说法错误的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"起升高度限位装置、三圈过放装置、力矩限制器等不是每台产品必备的安全装置，但它们的作用对起重机的安全作业亦是不可或缺的",{"key":24,"text":317,"correct":26},"防过放装置由开关、电位器和一套传动装置组成",{"key":28,"text":319,"correct":26},"起升高度限位装置由重锤和行程开关等元件组成",{"key":31,"text":321,"correct":22},"力矩限制器是重量检测器、长度检测器和幅度检测器等元件及显示器等的总称，一旦起重力矩达到额定力矩的 90%，其黄灯会亮，对操作者提出预警，一旦起重力矩达到额定力矩 100％~102％将切断起重机危险方面的动作，有效防止破坏的现象发生",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},997679,"下列不属于桥式起重机安全保护装置的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"缓冲器及端部止挡",{"key":24,"text":329,"correct":26},"起重量限制器",{"key":28,"text":331,"correct":26},"夹轨器",{"key":31,"text":333,"correct":22},"小车牵引机构",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},997680,"下列不属于桥式起重机主要参数的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"额定起重量",{"key":24,"text":341,"correct":26},"跨度",{"key":28,"text":343,"correct":22},"臂长",{"key":31,"text":345,"correct":26},"起升高度",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},997681,"下列桥式起重机使用做法错误的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":26},"吊运小于额定起重量 50％的物件，允许两个机构同时动作",{"key":24,"text":353,"correct":22},"起重机在没有障碍物的线路上运行时，吊钩或吊具以及吊物底面，必须离地面 0.5m 以上",{"key":28,"text":355,"correct":26},"吊钩处于下极限位置时，卷筒上必须保留有两圈以上的安全绳圈",{"key":31,"text":357,"correct":26},"司机室或起重机体的接地位置应多于两处，起重机上任何一点到电源中性点间的接地电阻，均应小于 4Ω",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},997682,"下列关于其中将机械作业安全管理各方职责说法错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"使用单位应当在安装完成后组织出租、安装、监理等有关单位进行验收",{"key":24,"text":365,"correct":26},"依法发包给两个及两个以上施工单位的工程，不同施工单位在同一施工现场使用多台塔式起重机作业时，建设单位应当协调组织制定防止塔式起重机相互碰撞的安全措施",{"key":28,"text":367,"correct":22},"施工总承包单位制定建筑起重机械安装、拆卸工程生产安全事故应急救援预案",{"key":31,"text":369,"correct":26},"使用单位应当在安装完成后组织出租、安装、监理等有关单位进行验收并自建筑起重机械安装验收合格之日起 30 日内，向工程所在地县级以上地方人民政府建设主管部门办理建筑起重机械使用登记",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},997683,"下列关于塔式起重机的基本构造及原理的描述中正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":26},"塔式起重机能靠近建筑物，其幅度利用率可达全幅度的90％",{"key":24,"text":377,"correct":26},"塔式起重机的主参数是最大额定起重量",{"key":28,"text":379,"correct":26},"最大额定起重力矩是最大额定起重量与其最大工作幅度的乘积",{"key":31,"text":381,"correct":22},"塔式起重机的基本构造包括金属结构、工作机构、驱动控制系统和安全防护装置四个部分",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},997684,"塔式起重机的主要安全防护装置不包括（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"行走限位器",{"key":24,"text":389,"correct":22},"安全阀",{"key":28,"text":391,"correct":26},"测力环",{"key":31,"text":393,"correct":26},"力矩限制器",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},997685,"下列关于塔式起重机的安全防护装置的说法中错误的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":26},"测力环一端固定于支座上，另一端固定在滑轮轴的一端轴伸上",{"key":24,"text":401,"correct":22},"测力环内的金属片与测力环壳体固接，并随壳体受力变形而延伸。金属片起到凸轮作用压迫触头接通起升机构的电源",{"key":28,"text":403,"correct":26},"力矩限制器大都装设在塔顶结构的主弦杆上",{"key":31,"text":405,"correct":26},"主弦杆因负载变形，变形通过放大杆的作用而使螺钉压迫限位开关触头的压键，从而切断起升机构的电源",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},997686,"塔式起重机安装、拆卸前应编制专项施工方案。专项施工方案应进行审核并审批后，经批准实施。塔式起重机的专项施工方案应由（ ）编制。",[410,411,412,413],{"key":20,"text":141,"correct":26},{"key":24,"text":139,"correct":26},{"key":28,"text":135,"correct":22},{"key":31,"text":414,"correct":26},"监理单位",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},997687,"塔式起重机在使用过程中需要附着的，亦应制定相应的附着专项施工方案。专项施工方案实施前，应组织安全施工技术交底并签字确认，同时将专项施工方案、安装拆卸人员名单、安装拆卸时间等资料报施工总承包单位和监理单位审核合格后，告知工程所在地（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"县级以上地方人民政府安全主管部门",{"key":24,"text":422,"correct":22},"县级以上地方人民政府建设主管部门",{"key":28,"text":424,"correct":26},"市级以上地方人民政府安全主管部门",{"key":31,"text":426,"correct":26},"市级以上地方人民政府建设主管部门",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},997688,"下列关于塔式起重机常见分类说法中错误的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"按回转方式可分为上回转式塔式起重机和下回转式塔式起重机",{"key":24,"text":434,"correct":26},"按变幅方式分类可分为小车变幅式塔式起重机和动臂变幅式塔式起重机",{"key":28,"text":436,"correct":26},"按起重臂支撑方式可分为塔头式和平头式两类",{"key":31,"text":438,"correct":22},"按有无行走机构分类，有固定式和飞模式两类",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},997689,"塔式起重机使用环境正确的是（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":26},"工作环境温度-20～+20℃",{"key":24,"text":446,"correct":26},"装架设时起重机顶部平均瞬时风速不大于10 m／s",{"key":28,"text":448,"correct":22},"工作状态时起重机顶部平均瞬时风速不大于20 m／s",{"key":31,"text":450,"correct":26},"海拔高度2000 m以下",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":20,"analysis":33},997690,"下列关于施工升降机的安全使用说法中正确的是（ ）。",[455,457,459,460],{"key":20,"text":456,"correct":22},"施工升降机的司机必须经专门安全技术培训，考试合格，持证上岗",{"key":24,"text":458,"correct":26},"特殊情况时可以行程限位开关自动碰撞的方法停机",{"key":28,"text":295,"correct":26},{"key":31,"text":461,"correct":26},"开动梯笼时。如有特殊需要安全吊杆可悬挂其他物品",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},997691,"下列关于起重机起吊作业中的注意事项描述正确的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"禁止起吊载荷悬挂停留较长时间",{"key":24,"text":469,"correct":22},"禁止从驾驶室前方吊货",{"key":28,"text":471,"correct":26},"禁止吊物自由下落",{"key":31,"text":473,"correct":26},"在起重作业范围内，除司索工外其他人不得进入",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},997692,"下列关于桥式、门式起重机的安全使用说法中，正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"起重机在没有障碍物的线路上运行时，吊钩或吊具以及吊物地面，必须离地面1 m以上",{"key":24,"text":481,"correct":26},"吊运小于额定起重量70％的物件，允许两个机构同时作用",{"key":28,"text":483,"correct":26},"具有主、副钩的桥式起重机，可同时上升或下降主、副钩",{"key":31,"text":485,"correct":22},"吊钩处于极限位置时，卷筒上必须保留有两圈以上的安全绳圈",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},997693,"塔式起重机的安装流程中包含：①安装塔身；②安装平衡臂；③安装起重臂；④安装顶升套架；⑤基础的制作与安装；⑥安装回转支撑等步骤。以上步骤中，按照塔式起重机的安装流程要求进行排序，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"①②③④⑤⑥",{"key":24,"text":493,"correct":26},"⑥⑤④③②①",{"key":28,"text":495,"correct":22},"⑤①④⑥②③",{"key":31,"text":497,"correct":26},"⑤①④⑥③②",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},997694,"塔式起重机安装完成后需要进行顶升，下列关于顶升过程描述错误的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"在顶升过程中不得随意拆卸液压元器件",{"key":24,"text":505,"correct":26},"在顶升起重臂的正下方准备好顶升用的标准节，并选择好配平重物",{"key":28,"text":507,"correct":22},"在顶升油缸的半程进行试运转",{"key":31,"text":509,"correct":26},"吊起配平重物，调整变幅小车的位置找到平衡点",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},997695,"施工方应组织设备供应方、安装单位、使用单位、监理单位对塔式起重机联合验收。实行施工总承包的，由（ ）组织验收。",[514,515,517,519],{"key":20,"text":141,"correct":26},{"key":24,"text":516,"correct":22},"总承包单位",{"key":28,"text":518,"correct":26},"总监理单位",{"key":31,"text":135,"correct":26},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},997696,"塔式起重机安装验收合格后，施工单位应向工程所在地县级以上地方人民政府建设主管部门办理建筑起重机械使用登记。登记日期应在验收合格之日起（ ）日内。",[524,526,528,530],{"key":20,"text":525,"correct":26},"10",{"key":24,"text":527,"correct":26},"20",{"key":28,"text":529,"correct":22},"30",{"key":31,"text":531,"correct":26},"40",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},997697,"施工升降机主参数代号包括特性代号、对重代号等。表示为SCD200／250的施工升降机，其含义表述正确的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":26},"双吊笼无对重。一个吊笼的额定载重量为200 kg，另一个吊笼额定载重量为250 kg",{"key":24,"text":539,"correct":26},"双吊笼无对重．一个吊笼的额定载重量为2000 kg，另一个吊笼额定载重量为2500 kg",{"key":28,"text":541,"correct":26},"双吊笼有对重。一个吊笼的额定载重量为200 kg，另一个吊笼额定载重量为250 kg",{"key":31,"text":543,"correct":22},"双吊笼有对重，一个吊笼的额定载重量为2000 kg，另一个吊笼额定载重量为2500 kg",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},997698,"双笼不带对重升降机的安装过程中，首先应将基础表面清扫干净后安装底盘，然后安装1个基础节和安装2个标准节，而后应当安装的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"将左右两只吊笼下的吊笼缓冲弹簧安装到位",{"key":24,"text":551,"correct":26},"安装左吊笼",{"key":28,"text":553,"correct":26},"安装右吊笼",{"key":31,"text":555,"correct":26},"安装吊笼传动机构",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},997699,"物料提升机是起重量在2000 kg以下，以卷扬机为动力，以吊笼为工作装置的垂直运输体系。下列关于物料提升机说法中错误的是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":26},"根据物料提升机的机构形式的不同．可以分成龙门架式和井架式两大类",{"key":24,"text":563,"correct":26},"根据驱动方式的不同，可分为卷扬式和曳引式两类",{"key":28,"text":565,"correct":26},"根据高度不同也可以分为高架体和低架体",{"key":31,"text":567,"correct":22},"高度在50 m以上的物料提升机称为高架提升机",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},997700,"下列不属于物料提升机的安全保护装置的是（ ）。",[572,574,575,577],{"key":20,"text":573,"correct":26},"安全停靠装置",{"key":24,"text":245,"correct":26},{"key":28,"text":576,"correct":26},"上极限限位器",{"key":31,"text":389,"correct":22},{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},997701,"下列关于汽车起重机的安全装置说法正确的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":26},"实际起重力矩大于额定起重力矩，会造成两种作业失效形式，一是吊臂折弯变形，二是吊臂扭曲",{"key":24,"text":585,"correct":26},"一旦起重力矩达到额定力矩的100％，其黄灯会亮，对操作者提出预警",{"key":28,"text":587,"correct":26},"当卷筒下放钢丝绳，只剩下最后一圈时，防过放装置开关接通，停止下放动作",{"key":31,"text":589,"correct":22},"吊钩起升时，当钩体碰到高度限位装置的重锤时，行程开关失重，开关动作．上升动作被切断",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},997702,"依据《建筑起重机械安全监督管理规定》的规定，被纳入特种设备目录的起重机械在建筑工地和市政工程工地安装、拆卸和使用由（ ）实施监督管理。",[594,595,597,599],{"key":20,"text":141,"correct":26},{"key":24,"text":596,"correct":26},"应急管理部门",{"key":28,"text":598,"correct":26},"住房主管部门",{"key":31,"text":600,"correct":22},"建设主管部门",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":24,"analysis":33},997703,"在建筑起重机械的租赁、安装、拆卸和使用过程中，出租单位、安装单位、使用单位、总承包单位和监理单位应当进行相应的管理。对于以下几种类型的设备可以出租和使用的是（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":26},"属国家明令淘汰或者禁止使用的",{"key":24,"text":608,"correct":22},"接近安全技术标准或者制造厂家规定的使用年限的",{"key":28,"text":610,"correct":26},"经检验达不到安全技术标准规定的",{"key":31,"text":612,"correct":26},"没有完整安全技术档案的",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]