[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-996868":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},996868,732,1,"单选题","下列关于铸造作业中的浇注作业的安全措施中，错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","浇注前检查浇包、升降机构、自锁机构、抬架是否完好",false,{"key":16,"text":17,"correct":18},"B","浇包盛铁水不得超过容积的90％",true,{"key":20,"text":21,"correct":14},"C","操作工穿戴好防护用品",{"key":23,"text":24,"correct":14},"D","现场有人统一指挥","浇注作业一般包括烘包、浇注和冷却三个工序。浇注前检查浇包是否符合要求，升降机构、倾转机构、自锁机构及抬架是否完好、灵活、可靠；浇包盛铁水不得太满，不得超过容积的80％，以免洒出伤人；浇注时，所有与金属熔液接触的工具，如扒渣棒、火钳等均需预热，防止与冷工具接触产生飞溅。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产专业实务(原案例)","建筑工程",0]