[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-995322":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":24},995322,729,1,"单选题","浇注作业一般包括烘包、浇注和冷却三个工序。浇注前检查浇包是否符合要求，升降机构、倾转机构、自锁机构及抬架是否完好、灵活、可靠;浇包盛铁水不得太满，不得超过容积的（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","80%",true,{"key":16,"text":17,"correct":18},"B","85%",false,{"key":20,"text":21,"correct":18},"C","90%",{"key":23,"text":21,"correct":18},"D","浇注作业一般包括烘包、浇注和冷却三个工序。浇注前检查浇包是否符合要求，升降机构、倾转机构、自锁机构及抬架是否完好、灵活、可靠;浇包盛铁水不得太满，不得超过容积的80%",{"id":6,"name":26,"category":27,"favorite":28},"安全生产技术基础","建筑工程",0]