[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-994449":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},994449,726,2,"多选题","建设项目的职业危害防护设施应当与主体工程同时()，职业危害防护设施所需费用应当纳入建设项目工程预算。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","竣工验收",false,{"key":16,"text":17,"correct":14},"B","可行性论证",{"key":19,"text":20,"correct":21},"C","投入生产和使用",true,{"key":23,"text":24,"correct":21},"D","施工",{"key":26,"text":27,"correct":21},"E","设计","CDE","建设项目的职业病防护设施所需费用应当纳入建设项目工程预算，并与主体工程同时设计、同时施工、同时投入生产和使用 。",{"id":6,"name":31,"category":32,"favorite":33},"安全生产管理","建筑工程",0]