[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-994410":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},994410,726,2,"多选题","新建项目进行安全验收评价时评价机构首先需要依据建设项目前期技术文件要求，对安全生产保障实施情况和相关对策措施的落实情况进行评价。建设项目前期技术文件主要包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","安全预评价",true,{"key":16,"text":17,"correct":14},"B","可行性研究报告",{"key":19,"text":20,"correct":21},"C","安全现状评价报告",false,{"key":23,"text":24,"correct":21},"D","现场灾害事故报告",{"key":26,"text":27,"correct":14},"E","初步设计中安全卫生专篇","ABE","安全验收评价主要从以下方面进行：评价对象前期(安全预评价、可行性研究报告、初步设计中安全卫生专篇等)对安全生产保障等内容的实施情况和相关对策措施建议的落实情况。",{"id":6,"name":31,"category":32,"favorite":33},"安全生产管理","建筑工程",0]