[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-993159":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},993159,726,1,"单选题","以下不属于安全评价准备阶段的工作是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","收集工程、系统的技术资料",false,{"key":16,"text":17,"correct":14},"B","明确被评价对象",{"key":19,"text":20,"correct":14},"C","收集国内外相关法律法规、技术标准",{"key":22,"text":23,"correct":24},"D","分析辩识危险、有害因素",true,"本题考查的是安全评价程序。选项D属于安全评价程序的内容。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产管理","建筑工程",0]