[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-992567":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},992567,726,1,"单选题","安全技术措施计划一般由()审批。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总工程师",true,{"key":16,"text":17,"correct":18},"B","单位主要负责人",false,{"key":20,"text":21,"correct":18},"C","投资人",{"key":23,"text":24,"correct":18},"D","董事会","上级安全、技术、计划部门对上报安全技术措施计划进行联合会审后，报单位有关领导审批，安全技术措施计划一般由生产经营单位主管生产的领导或总工程师审批。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产管理","建筑工程",0]