[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-992497":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},992497,726,1,"单选题","《安全生产法》明确了建设项目“三同时”阶段相关单位的职责。建设项目施工期间，应由（ ）对安全设施的工程质量负责。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":14},"B","安全评价机构",{"key":19,"text":20,"correct":21},"C","施工单位",true,{"key":23,"text":24,"correct":14},"D","安全生产监督管理部门","施工单位应当严格按照安全设施设计和相关施工技术标准、规范施工，并对安全设施的工程质量负责。施工单位发现安全设施设计文件有错漏的，应当及时向生产经营单位、设计单位提出。生产经营单位、设计单位应当及时处理。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产管理","建筑工程",0]