[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-991580":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},991580,724,1,"单选题","依据《煤矿建设项目安全设施监察规定》，煤矿建设项目在竣工完成后，应当在正式投入生产或使用前进行联合试运转。联合试运转的时间一般为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1至3个月",false,{"key":16,"text":17,"correct":18},"B","1至6个月",true,{"key":20,"text":21,"correct":14},"C","3至6个月",{"key":23,"text":24,"correct":14},"D","6至12个月","第二十六条 煤矿建设项目在竣工完成后，应当在正式投入生产或使用前进行联合试运转。联合试运转的时间应不少于1个月，但最长不得超过6个月。 煤矿建设项目联合试运转，应经有关主管部门批准，并按照本规定第六条的规定报煤矿安全监察机构备案。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产法及相关法律知识","建筑工程",0]