[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-991366":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},991366,724,1,"单选题","《建设工程安全生产管理条例》规定了建筑施工工期的内容，建设单位工期按照要求，应该做到（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可以压缩合同工期",false,{"key":16,"text":17,"correct":18},"B","不得压缩合同工期",true,{"key":20,"text":21,"correct":14},"C","可以适当地压缩合同工期",{"key":23,"text":24,"correct":14},"D","压缩工期最多不超过10天","《建设工程安全生产管理条例》第七条规定，建设单位不得对勘察、设计、施工、工程监理等单位提出不符合建设工程安全生产法律、法规和强制性标准规定的要求，不得压缩合同约定的工期。",{"id":6,"name":27,"category":28,"favorite":29},"安全生产法及相关法律知识","建筑工程",0]