[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988995":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},988995,723,1,"单选题","通常首次检定费和周期检定费应分别计入（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安装成本和维护成本",true,{"key":16,"text":17,"correct":18},"B","基本成本和安装成本",false,{"key":20,"text":21,"correct":18},"C","维护成本和安装成本",{"key":23,"text":24,"correct":18},"D","基本成本和维护成本","测量仪器的经济性是指该仪器的成本，它包括基本成本、安装成本及维护成本。 基本成本一般是指设计制造成本和运行成本。对于连续生产过程中使用的测量仪器，安 装成本中还应包括安装时生产过程的停顿损失费（停机费）。通常认为，首次检定费应计 入安装成本，而周期检定费应计入维护成本。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]