[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988791":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988791,723,2,"多选题","检验站和检验人员要有适当的负荷，检验站和检验人员太少，会造成的问题包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","待检时间太长",true,{"key":16,"text":17,"correct":18},"B","人员疲劳",false,{"key":20,"text":21,"correct":14},"C","影响生产",{"key":23,"text":24,"correct":14},"D","增加错、漏检可能",{"key":26,"text":27,"correct":18},"E","节奏紧张","ACD","检验站和检验人员要有适当的负荷，检验站的数量和检验人员、检测设备、场 地面积都要适应作业和检验的需要。检验站和检验人员太少，会造成等待检验时间太 长，影响作业，甚至增加错检与漏检的可能；人员太多，又会人浮于事，工作效率不 高，并增加检验成本。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]