[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988709":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988709,723,2,"多选题","受审核方在收到审核计划后，如果出现了异议，则异议应在（ ）之间予以解决。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","审核组长",true,{"key":16,"text":17,"correct":14},"B","审核委托方",{"key":19,"text":20,"correct":21},"C","审核组",false,{"key":23,"text":24,"correct":14},"D","受审核方",{"key":26,"text":27,"correct":21},"E","技术专家","ABD","在现场审核活动开始前，审核计划应经审核委托方评审和接受，并提交给受审核 方。受审核方的任何异议应在审核组长、受审核方和审核委托方之间予以解决。任何经 修改的审核计划应在继续审核前征得有关各方的同意。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]