[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988706":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988706,723,2,"多选题","负责管理审核方案的人员或审核组长与受审核方建立初步联系的目的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","与受审核方的代表建立沟通渠道",true,{"key":16,"text":17,"correct":14},"B","要求接触相关文件，包括记录",{"key":19,"text":20,"correct":21},"C","确定实施审核的范围",false,{"key":23,"text":24,"correct":14},"D","确定适用的现场安全规则",{"key":26,"text":27,"correct":14},"E","就审核组向导的需求达成一致意见","ABDE","与受审核方就审核的事宜建立初步联系可以是正式或非正式的，但应由负责管理 审核方案的人员或审核组长进行。初步联系的目的是：①与受审核方的代表建立沟通渠 道；②确定实施审核的权限；③提供有关建议的时间安排和审核组组成的信息；④要求 接触相关文件，包括记录；⑤确定适用的现场安全规则；⑥对审核作安排；⑦就观察员 的参与和审核组向导的需求达成一致意见。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]