[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988701":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988701,723,2,"多选题","关于“质量管理体系审核与质量管理体系认证”，下列认识正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","质量管理体系认证包括了质量管理体系审核的全部活动",true,{"key":16,"text":17,"correct":14},"B","质量管理体系审核是质量管理体系认证的基础和核心",{"key":19,"text":20,"correct":21},"C","审核和认证在分别提交审核报告和颁发认证证书后，即告终止",false,{"key":23,"text":24,"correct":21},"D","体系审核和体系认证都必须是第三方审核",{"key":26,"text":27,"correct":21},"E","体系审核是第一方审核，体系认证是第三方审核","AB","认证在提交审核报告后还有纠正措施的验证、监督审核等；体系审核可包括第一 方、第二方和第三方审核，对于认证来说，所进行的审核就是一种第三方审核。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]