[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988687":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988687,723,2,"多选题","质量管理体系认证的主要活动包括（ ）。[2012年真题]",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","寻找并确定认证机构",false,{"key":16,"text":17,"correct":18},"B","认证申请与受理",true,{"key":20,"text":21,"correct":18},"C","纠正措施的验证",{"key":23,"text":24,"correct":18},"D","颁发认证证书",{"key":26,"text":27,"correct":18},"E","监督审核与再认证","BCDE","质量管理体系认证的主要活动包括以下几点：①认证申请与受理；②审核的启 动；③文件评审；④现场审核的准备；⑤现场审核的实施；⑥审核报告的编制、批准和 分发；⑦纠正措施的验证；⑧颁发认证证书；⑨监督审核与再认证。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]