[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988676":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},988676,723,1,"单选题","现场审核中的末次会议应当由（ ）主持。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","审核组长",true,{"key":16,"text":17,"correct":18},"B","向导",false,{"key":20,"text":21,"correct":18},"C","企业的最高管理者",{"key":23,"text":24,"correct":18},"D","企业授权的代表","末次会议应由审核组长主持，并以受审核方能够理解和认同的方式提出审核发现 和结论，适当时，双方就受审核方提出的纠正和预防措施计划的时间表达成共识。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]