[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988675":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},988675,723,1,"单选题","关于质量体系审核，下列说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","收集信息的方法不包括面谈，必须是有力的证据",false,{"key":16,"text":17,"correct":18},"B","除非法律要求，审核组若没有得到审核委托方和（适当时）受审核方的明确批准，不 应泄露审核中获得的其他信息或审核报告",true,{"key":20,"text":21,"correct":14},"C","审核报告属审核方所有",{"key":23,"text":24,"correct":14},"D","若审核组中的审核员没有完全具备审核所需的知识和技能，可通过技术专家予以满 足。技术专家可独立审核","收集信息的方法包括：①面谈、对活动的观察、文件评审；②审核报告属审核委 托方所有，审核组成员和审核报告的所有接受者都应尊重并保守报告的秘密；③若审核 组中的审核员没有完全具备审核所需的知识和技能，可通过技术专家予以满足。技术专 家应在审核员的指导下进行工作。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]