[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988650":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},988650,723,1,"单选题","下列各项不属于建立有效质量管理体系活动的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","确定质量方针目标",false,{"key":16,"text":17,"correct":14},"B","管理评审",{"key":19,"text":20,"correct":14},"C","确定职责和权限",{"key":22,"text":23,"correct":24},"D","向外界发布巳通过认证",true,"质量管理体系的主要活动包括：①学习标准；②确定质量方针和质量目标；③质 量管理体系策划；④确定职责和权限；⑤编制质量管理体系文件；⑥质量管理体系文件 的发布和实施；⑦学习质量管理体系文件；⑧质量管理体系的运行；⑨管理评审。向外 界发布已通过认证只是活动的结果而已，本身并不是有效的质量管理活动。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]