[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988615":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988615,723,2,"多选题","下列各项属于管理评审主要输出内容的有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","质量管理体系及其过程有效性的改进",true,{"key":16,"text":17,"correct":14},"B","与顾客要求有关的产品的改进",{"key":19,"text":20,"correct":14},"C","资源需求",{"key":22,"text":23,"correct":24},"D","顾客反馈",false,{"key":26,"text":27,"correct":24},"E","可能影响质量管理体系的变更","ABC","管理评审过程的输出应包括与以下方面有关的决定和措施：①质量管理体系及其 过程有效性的改进；②与顾客要求有关的产品的改进；③资源需求，包括由于改进所引 发的资源需求。顾客反馈和可能影响质量管理体系的变更都为管理评审应输入的内容。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]