[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988422":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988422,723,2,"多选题","应用《卓越绩效评价准则》对过程进行评价时，要求按（ ）进行评价。[2008年真题]",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","过程",false,{"key":16,"text":17,"correct":18},"B","方法",true,{"key":20,"text":21,"correct":18},"C","展开",{"key":23,"text":24,"correct":18},"D","学习",{"key":26,"text":27,"correct":18},"E","整合","BCDE","应用《卓越绩效评价准则》对过程进行评价时，用方法一展开一学习一整合四个要 素评价组织的过程成熟程度。评价要点包括：①方法，即方法的适宜性、有效性和系统 性；②展开，方法持续、广泛应用的程度；③学习方法通过循环的评价、改进和创新、 分享而不断完善；④整合，各过程、部门的方法协调一致、融合互补，支持组织的使命、 愿景和战略。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]