[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988238":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},988238,723,1,"单选题","由现有过程的故障造成的损失是（ ）。[2012年真题]",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","符合性成本",false,{"key":16,"text":17,"correct":18},"B","非符合性成本",true,{"key":20,"text":21,"correct":14},"C","内部故障成本",{"key":23,"text":24,"correct":14},"D","外部故障成本","不合格（不符合）成本是指由现有过程的缺陷（故障)所发生的费用。A项，符合成 本是指现有的过程不出现缺陷（故障）而满足顾客所有明示的和隐含的需求所发生的费 用；不合格（不符合）成本是指由现有过程的缺陷（故障）所发生的费用。C项，内部故障 成本(损失）是指产品在交付前不能满足质量要求所造成的损失。D项，外部故障成本 (损失）是指产品在交付后不能满足质量要求所造成的损失。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]