[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988167":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},988167,723,1,"单选题","PDCA(策划一实施一检査一处理)循环又称“戴明环”，最早是由（ ）提出的。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","朱兰",false,{"key":16,"text":17,"correct":18},"B","休哈特",true,{"key":20,"text":21,"correct":14},"C","戴明",{"key":23,"text":24,"correct":14},"D","菲根堡姆","PDCA(策划一实施一检查一处理)循环是由休哈特提出的，随后被戴明采纳、宣 传，获得普及，所以它也被称为“戴明环”。随着全面质量管理理念的深入，该循环在持 续改善产品质量方面得到广泛使用，取得良好效果。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]