[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988111":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988111,723,2,"多选题","在对供应商所提供的产品进行全数检验之前，企业须在采购资料中就（ ）等方面与供 应商达成一致。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","检验方法",true,{"key":16,"text":17,"correct":14},"B","使用的计量器具",{"key":19,"text":20,"correct":21},"C","检验程序",false,{"key":23,"text":24,"correct":14},"D","检验人员的要求",{"key":26,"text":27,"correct":14},"E","不合格的判定和处置","ABDE","对供应商提供的样件一般采用全数检验的形式进行检验，在进行全数检验以前， 企业一定要在采购资料中对检验方法、使用的计量器具、检验人员的要求、不合格的判 定和处置等方面与供应商达成一致。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]