[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988095":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988095,723,2,"多选题","对供应商审核的时机，有可能选在（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","产品设计开发初期",true,{"key":16,"text":17,"correct":14},"B","产品试制阶段",{"key":19,"text":20,"correct":14},"C","批量供货之前",{"key":22,"text":23,"correct":24},"D","市场调研阶段",false,{"key":26,"text":27,"correct":24},"E","批量生产阶段","ABC","一般来说，在批量供货之前进行审核，审核合格的供应商正式列人合格供应商名 单。对提供重要产品的I类供应商，企业可能会将供应商审核提前到产品试制阶段；有 些产品特别重要或者投资额特别巨大，企业为了减少风险，甚至在产品设计和开发的初 期也可能需要对供应商进行审核。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]