[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988090":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988090,723,2,"多选题","对潜在供应商评价的内容需根据（ ）确定。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","供应商大小",false,{"key":16,"text":17,"correct":14},"B","企业购买能力",{"key":19,"text":20,"correct":21},"C","供应商类型",true,{"key":23,"text":24,"correct":21},"D","零部件的重要程度",{"key":26,"text":27,"correct":21},"E","采购价值","CDE","在确定潜在供应商之后，企业一般还应对每个供应商进行独立的评价，当然对于一些简单、低价值的采购，可能并不需要进一步的评价。评价的内容需要根据以下内 容确定：①供应商类型；②采购价值；③零部件的重要程度。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]