[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988088":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},988088,723,2,"多选题","仅考虑供应商的质量控制，策划阶段的主要工作有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","熟悉采购要求",true,{"key":16,"text":17,"correct":14},"B","研究拟采购的产品的质量标准",{"key":19,"text":20,"correct":21},"C","产品的需求量",false,{"key":23,"text":24,"correct":21},"D","确定供应商的数量",{"key":26,"text":27,"correct":14},"E","制定供应商评价标准","ABE","仅就供应商的质量控制而言，策划阶段的主要工作有：①熟悉采购要求；②研 究拟采购产品的质量标准；③制定供应商评价准则。随着设计和开发的进展，对供应商 的要求也会发生变化，故这里制定的准则只能是初步的。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业综合知识","建筑工程",0]