[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988065":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},988065,723,1,"单选题","对供应商进行审核的顺序是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","产品审核、质量管理体系审核、过程审核",false,{"key":16,"text":17,"correct":14},"B","过程审核、产品审核、质量管理体系审核",{"key":19,"text":20,"correct":21},"C","产品审核、过程审核、质量管理体系审核",true,{"key":23,"text":24,"correct":14},"D","质量管理体系审核、过程审核、产品审核","对供应商审核的顺序应该是：①进行产品审核，只有在产品审核合格的基础上才 能继续进行其它审核，而当产品不符合要求时，没有必要进行质量管理体系审核和过程 审核；②进行过程审核；③进行质量管理体系审核。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]