[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988062":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},988062,723,1,"单选题","当供应商提供的产品的质量对生产工艺有很强的依赖性时，企业有必要对供应商进行 ( )审核。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","产品",false,{"key":16,"text":17,"correct":14},"B","体系",{"key":19,"text":20,"correct":21},"C","过程",true,{"key":23,"text":24,"correct":14},"D","环境","过程审核视企业产品的实际情况而定，不是每一种采购产品都需要进行过程审 核，一般来说，只有当供应商提供的产品对生产工艺有很强的依赖性的时候，特别是其 关键、特殊过程，才有必要进行过程审核。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]