[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988061":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},988061,723,1,"单选题","对I类供应商的审核时机最好是在（ ）阶段。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","批量供货之前",false,{"key":16,"text":17,"correct":14},"B","生产过程",{"key":19,"text":20,"correct":14},"C","产品检验",{"key":22,"text":23,"correct":24},"D","产品试制",true,"",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]