[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-988060":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},988060,723,1,"单选题","对待选供应商的审核时机，-般来说是在（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","批量供货之前",true,{"key":16,"text":17,"correct":18},"B","产品设计阶段",false,{"key":20,"text":21,"correct":18},"C","产品开发初期",{"key":23,"text":24,"correct":18},"D","产品试制","对待选供应商进行审核的时机，一般来说，在批量供货之前进行审核，审核合格 的供应商正式列人合格供应商名单。对提供重要产品的I类供应商，企业可能会将供应 商审核提前到产品试制阶段；有些特别重要或者投资额特别巨大的产品，企业为了减少 风险，甚至在产品设计和开发的初期就对供应商进行审核。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业综合知识","建筑工程",0]