[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-722-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},722,"中级质量专业理论与实务","建筑工程",0,26,50,1518,[13,34,46,57,69,81,92,102,112,124,136,148,160,172,181,193,205,217,229,238,247,255,267,279,291,303,315,327,337,346,355,366,375,387,399,411,423,435,447,459,471,489,504,519,534,549,563,578,593,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},987658,1,"单选题","在树图中对提出的手段措施要一一评价，有的需要经过（ ）才能确认。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","汇报",false,{"key":24,"text":25,"correct":22},"B","预测",{"key":27,"text":28,"correct":29},"C","调查",true,{"key":31,"text":32,"correct":22},"D","计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},987659,"从甲地到乙地可以有多种到达的通道，在策划行动计划时可以用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"控制法",{"key":24,"text":41,"correct":29},"PDPC法",{"key":27,"text":43,"correct":22},"系统图法",{"key":31,"text":45,"correct":22},"PDPC循环",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},987660,"利用（ ），可从全局、从整体掌握系统状态以做出全局性判断，可按时间顺序掌握系统的进展情况。",[50,52,54,55],{"key":20,"text":51,"correct":22},"树图",{"key":24,"text":53,"correct":22},"排列图",{"key":27,"text":41,"correct":29},{"key":31,"text":56,"correct":22},"直方图",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":27,"analysis":33},987661,"下列各项属于PDPC法的用途的是（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"找出质量问题的主要影响因素",{"key":24,"text":64,"correct":22},"发现主要质量问题，抓住关键少数",{"key":27,"text":66,"correct":29},"制定科研项目的实施计划",{"key":31,"text":68,"correct":22},"从不同角度发现质量问题的特征",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":27,"analysis":33},987662,"( )的情况下，可用PDPC法。",[73,75,77,79],{"key":20,"text":74,"correct":22},"选择适宜的作业路径",{"key":24,"text":76,"correct":22},"确定具体的质量改进目标",{"key":27,"text":78,"correct":29},"对可能出现的问题提前做好准备",{"key":31,"text":80,"correct":22},"找出解决问题的主要途径",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":27,"analysis":33},987663,"为应付意外事件的发生提出的一种有助于使事态向理想方向发展的解决问题的方法称为( )。",[85,87,89,90],{"key":20,"text":86,"correct":22},"网络图法",{"key":24,"text":88,"correct":22},"亲和图法",{"key":27,"text":41,"correct":29},{"key":31,"text":91,"correct":22},"树图法",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},987664,"( )是把推进计划所必须的各项工作，按其时间顺序和从属关系，用网络形式表示的一种“矢线图”。",[96,97,98,100],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":22},{"key":27,"text":99,"correct":22},"亲和图",{"key":31,"text":101,"correct":29},"网络图",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},987665,"( )只能给出比较粗略的计划简单的作业指示，表现不出作业间的从属关系。",[106,107,108,110],{"key":20,"text":56,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":109,"correct":29},"甘特图",{"key":31,"text":111,"correct":22},"计划评审法",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":27,"analysis":33},987666,"网络图中的虚线箭头代表（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"该项作业人力资源充分，不怎么花费时间",{"key":24,"text":119,"correct":22},"该项作业不需要太多的资金",{"key":27,"text":121,"correct":29},"该项作业不需要时间",{"key":31,"text":123,"correct":22},"该项作业很容易完成，几乎不需要时间",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":20,"analysis":33},987667,"在网络图中，下列有关节点的说法有误的是（ ）。",[128,130,132,134],{"key":20,"text":129,"correct":29},"节点表示某一项作业的等待点",{"key":24,"text":131,"correct":22},"b.节点也称为事件，在图中用",{"key":27,"text":133,"correct":22},"节点不消耗资源，也不占用时间",{"key":31,"text":135,"correct":22},"节点只是时间的一个“交接点”",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},987668,"网络图中的节点中，标出的两个时间是（ ）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"最早完工时间和最迟完工时间",{"key":24,"text":143,"correct":29},"最早开工时间和最迟完工时间",{"key":27,"text":145,"correct":22},"最早开工时间和最迟开工时间",{"key":31,"text":147,"correct":22},"最迟开工时间和最迟完工时间",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":27,"analysis":33},987669,"关键线路是由（ ）组成。",[152,154,156,158],{"key":20,"text":153,"correct":22},"非关键线路",{"key":24,"text":155,"correct":22},"非关键工序",{"key":27,"text":157,"correct":29},"关键工序",{"key":31,"text":159,"correct":22},"总作业量",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":24,"analysis":33},987670,"关于关键线路，下列说法正确的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"关键线路是整个工期最短的线路",{"key":24,"text":167,"correct":29},"关键路线上的活动是影响整个工程进度的主要因素",{"key":27,"text":169,"correct":22},"关键线路是完成时间上有富裕，有机动时间的线路",{"key":31,"text":171,"correct":22},"关键线路是有时差的节点连结成的线路",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},987671,"1956年，美国的杜邦和兰德公司为了协调公司内部不同业务部门的工作，提出了( )，取得显著效果。",[176,177,178,179],{"key":20,"text":109,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":101,"correct":22},{"key":31,"text":180,"correct":29},"关键路线法",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},987672,"关于网络图，下列说法错误的是（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"网络图的工具是箭条图",{"key":24,"text":188,"correct":22},"一项任务或工程，可以分解为许多作业，这些作业在生产工艺和生产组织上相互依赖、相互制约，网络图可以把各项作业之间的这种依赖和制约关系清晰地表示出来",{"key":27,"text":190,"correct":29},"网络图存在某些缺陷，它不能找出影响工程进度的关键和非关键因素",{"key":31,"text":192,"correct":22},"在日程计划与进度方面，人们常使用甘特图",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},987673,"网络图能对某工作总体制订详细计划，保证计划的严密性，了解某项工作工期延误对总体的影响以及（ ）。",[197,199,201,203],{"key":20,"text":198,"correct":29},"对计划变更进行调整",{"key":24,"text":200,"correct":22},"对某作业收集数据",{"key":27,"text":202,"correct":22},"分析未完成原因",{"key":31,"text":204,"correct":22},"分析作业的主要性",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},987674,"网络图是一张（ ）图。",[209,211,213,215],{"key":20,"text":210,"correct":29},"有向无环",{"key":24,"text":212,"correct":22},"无向有环",{"key":27,"text":214,"correct":22},"无向无环",{"key":31,"text":216,"correct":22},"有向有环",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},987675,"网络图是安排和编制（ ），有效地实施进度管理的一种科学管理方法。",[221,223,225,227],{"key":20,"text":222,"correct":22},"最快路径",{"key":24,"text":224,"correct":29},"最佳日程计划",{"key":27,"text":226,"correct":22},"最好途径",{"key":31,"text":228,"correct":22},"快捷方式",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},987676,"()是一种利用多维思考去逐步明确问题的方法。",[233,234,236,237],{"key":20,"text":56,"correct":22},{"key":24,"text":235,"correct":29},"矩阵图",{"key":27,"text":101,"correct":22},{"key":31,"text":53,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},987677,"在寻求问题的解决手段时，若目的或结果能够展开为一元性手段或原因，则可用 ( )法。",[242,243,244,246],{"key":20,"text":235,"correct":22},{"key":24,"text":51,"correct":29},{"key":27,"text":245,"correct":22},"因果图",{"key":31,"text":56,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},987678,"在寻求问题的解决手段时，若有两种以上的目的或结果，则其展开用（ ）法较为合适。",[251,252,253,254],{"key":20,"text":235,"correct":29},{"key":24,"text":51,"correct":22},{"key":27,"text":245,"correct":22},{"key":31,"text":56,"correct":22},{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},987679,"常用的矩阵图种类有（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"A型",{"key":24,"text":262,"correct":22},"S型",{"key":27,"text":264,"correct":22},"H型",{"key":31,"text":266,"correct":29},"X型",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},987680,"L型矩阵图是由（ ）配置组成的矩形图。",[271,273,275,277],{"key":20,"text":272,"correct":29},"A类因素和B类因素",{"key":24,"text":274,"correct":22},"A类因素和C类因素",{"key":27,"text":276,"correct":22},"B类因素和C类因素",{"key":31,"text":278,"correct":22},"A类因素、B类因素和C类因素",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},987681,"矩阵图可用于（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"制定质量改进活动的先后程序",{"key":24,"text":286,"correct":29},"确定系统产品开发、改进的着眼点",{"key":27,"text":288,"correct":22},"拟订质量改进计划",{"key":31,"text":290,"correct":22},"确定项目实施的关键工序",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},987682,"亲和图可用于（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":29},"提出新的观念和方针",{"key":24,"text":298,"correct":22},"寻求项目实施的关键路线",{"key":27,"text":300,"correct":22},"寻找产生不良品的原因",{"key":31,"text":302,"correct":22},"制订市场产品发展战略",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},987683,"亲和图适合于（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":29},"需要时间、慢慢解决、不容易解决而非解决不可的问题",{"key":24,"text":310,"correct":22},"简单的、需要迅速解决的问题",{"key":27,"text":312,"correct":22},"时间紧、不容易解决而非要解决的问题",{"key":31,"text":314,"correct":22},"不容易解决、需要迅速解决的问题",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},987684,"亲和图是由（ ）于1970年前后研究开发并加以推广的方法。",[319,321,323,325],{"key":20,"text":320,"correct":22},"美国的甘特",{"key":24,"text":322,"correct":22},"美国的奥斯本",{"key":27,"text":324,"correct":29},"日本的川喜田二郎",{"key":31,"text":326,"correct":22},"意大利的帕累托",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},987685,"KJ法是（ ）的另一种说法。",[331,333,334,336],{"key":20,"text":332,"correct":22},"流程图",{"key":24,"text":235,"correct":22},{"key":27,"text":335,"correct":22},"头脑风暴法",{"key":31,"text":99,"correct":29},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":27,"analysis":33},987686,"( )是针对某一问题，充分收集各种经验知识、想法和意见等语言、文字资料，通过图形进行汇总，并按其相互亲和性归纳整理这些资料，使问题明确起来，求得统一认识和协调工作，以利于问题解决的一种方法。",[341,342,344,345],{"key":20,"text":335,"correct":22},{"key":24,"text":343,"correct":22},"过程决策程序图法",{"key":27,"text":88,"correct":29},{"key":31,"text":91,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},987687,"使用亲和图可以与（ ）结合。",[350,352,353,354],{"key":20,"text":351,"correct":22},"控制图",{"key":24,"text":235,"correct":22},{"key":27,"text":335,"correct":29},{"key":31,"text":45,"correct":22},{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},987688,"在绘制亲和图时，用于贯彻方针目标时常用的语言文字资料收集方法是（ ）。",[359,361,363,364],{"key":20,"text":360,"correct":22},"回忆法",{"key":24,"text":362,"correct":22},"文献调査法",{"key":27,"text":335,"correct":29},{"key":31,"text":365,"correct":22},"直接观察法",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},987689,"在绘制亲和图时，进行语言文字资料的收集时，可以达到认识事物的目的的方法是（）。",[370,372,373,374],{"key":20,"text":371,"correct":22},"文献观察法",{"key":24,"text":365,"correct":29},{"key":27,"text":335,"correct":22},{"key":31,"text":360,"correct":22},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},987690,"亲和图的绘制步骤包括：①收集语言资料；②制图；③将语言资料制成卡片；④应用；⑤确定课题；⑥整理综合卡片。下列排序正确的是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"①⑥③⑤②④",{"key":24,"text":382,"correct":22},"②④①③⑥⑤",{"key":27,"text":384,"correct":29},"⑤①③⑥②④",{"key":31,"text":386,"correct":22},"④①⑤③②⑥",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},987691,"在亲和图的使用过程中，（ ）是重要的一环。",[391,393,395,397],{"key":20,"text":392,"correct":22},"认识事物",{"key":24,"text":394,"correct":29},"资料收集",{"key":27,"text":396,"correct":22},"统一思想",{"key":31,"text":398,"correct":22},"确定课题",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},987692,"流程图是将一个（ ）的步骤用图的形式表示出来的一种图示技术。",[403,405,407,409],{"key":20,"text":404,"correct":22},"质量策划",{"key":24,"text":406,"correct":29},"过程",{"key":27,"text":408,"correct":22},"设计和开发",{"key":31,"text":410,"correct":22},"质量管理",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},987693,"无论是描述现有过程还是设计新过程流程图，应用程序中的第一项工作是（ ）该过程的开始和结束。",[415,417,419,421],{"key":20,"text":416,"correct":29},"判别",{"key":24,"text":418,"correct":22},"考虑",{"key":27,"text":420,"correct":22},"制订",{"key":31,"text":422,"correct":22},"分析",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":27,"analysis":33},987694,"使用水平对比法的组织将自己的产品和服务的过程和性能与（ ）进行对比。",[427,429,431,433],{"key":20,"text":428,"correct":22},"竞争对手",{"key":24,"text":430,"correct":22},"先进企业",{"key":27,"text":432,"correct":29},"公认的领先对手",{"key":31,"text":434,"correct":22},"合作伙伴",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},987695,"水平对比法的应用步骤包括：①确定对比的对象；②收集数据；③实施改进；④归纳对比分析数据；⑤选择用来进行水平比较的项目。下列排序正确的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"①②③④⑤",{"key":24,"text":442,"correct":22},"①④③⑤②",{"key":27,"text":444,"correct":29},"⑤①②④③",{"key":31,"text":446,"correct":22},"⑤③②④①",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},987696,"水平对比法的用途是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":29},"有助于认清目标和确定计划编制的优先顺序，以使自己在市场竞争中处于有利地位",{"key":24,"text":454,"correct":22},"用来设计一个新的过程，或用于删除一个旧的过程",{"key":27,"text":456,"correct":22},"确定新的方法，创造新的思想",{"key":31,"text":458,"correct":22},"从杂乱无章的资料中整理出事物的相互关系和脉络，就某件事情达成一致",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},987697,"关于水平对比法，下列说法不正确的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":22},"水平对比法可分为单独的、定期的和连续的三种",{"key":24,"text":466,"correct":22},"水平对比法有助于认清目标和确认计划编制的优先顺序",{"key":27,"text":468,"correct":29},"水平对比法所选择的领先对手必定是竞争对手",{"key":31,"text":470,"correct":22},"水平对比法的说数据收集方式有间接法和直接法两大类",{"id":472,"libraryId":5,"type":473,"typeLabel":474,"stem":475,"options":476,"answer":488,"analysis":33},987698,2,"多选题","下列关于质量改进“拟定对策并实施”中工具使用的表述正确的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":29},"可以使用头脑风暴法提出大量的可能对策",{"key":24,"text":480,"correct":29},"可以使用亲和图对提出的各种对策进行评价",{"key":27,"text":482,"correct":29},"可以使用PDPC制订对策的实施计划",{"key":31,"text":484,"correct":29},"可以使用网络图制订对策的计划进度",{"key":486,"text":487,"correct":22},"E","可以使用因果图分析对策的效果","ABCD",{"id":490,"libraryId":5,"type":473,"typeLabel":474,"stem":491,"options":492,"answer":503,"analysis":33},987699,"对于绘制因果图，下列叙述中正确的是（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"确定“结果”时应结合具体需要，为了避免绘制过多的图，可将不同的“结果”放在一张图中进行分析",{"key":24,"text":496,"correct":29},"绘制因果图一般有逻辑推理法和发散整理法两种方式",{"key":27,"text":498,"correct":29},"可以结合头脑风暴法一起使用",{"key":31,"text":500,"correct":29},"确定的原因应尽可能具体，应细分到能采取措施为止",{"key":486,"text":502,"correct":22},"因果图一旦确定，即不能更改","BCD",{"id":505,"libraryId":5,"type":473,"typeLabel":474,"stem":506,"options":507,"answer":518,"analysis":33},987700,"以下关于排列图的说法中正确的有（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":22},"排列图上不同矩形高度基本一致，说明已经找到比较理想的分类方式",{"key":24,"text":511,"correct":29},"分析问题原因时，可以使用排列图寻找关键原因",{"key":27,"text":513,"correct":29},"掌握现状时，可以使用排列图发现主要的不合格类型",{"key":31,"text":515,"correct":22},"排列图是一种特殊的直方图，图中的各个矩形由低至高排列",{"key":486,"text":517,"correct":29},"同样的数据集使用不同的分类方法，得到的排列图也不相同","BCE",{"id":520,"libraryId":5,"type":473,"typeLabel":474,"stem":521,"options":522,"answer":533,"analysis":33},987701,"使用头脑风暴法时，为了引发和产生创造性思维，下列观点中，正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":29},"与会者应完全平等",{"key":24,"text":526,"correct":22},"不应提出不现实的论点",{"key":27,"text":528,"correct":22},"为统一认识可进行适当批评",{"key":31,"text":530,"correct":29},"应给每位与会者提供发言的机会",{"key":486,"text":532,"correct":29},"应忠实记录与会者的观点","ADE",{"id":535,"libraryId":5,"type":473,"typeLabel":474,"stem":536,"options":537,"answer":548,"analysis":33},987702,"树图的类型包括（ ）。",[538,540,542,544,546],{"key":20,"text":539,"correct":29},"构成因素展开型",{"key":24,"text":541,"correct":22},"构成因素收束型",{"key":27,"text":543,"correct":22},"计数型",{"key":31,"text":545,"correct":29},"措施展开型",{"key":486,"text":547,"correct":22},"归纳总结型","AD",{"id":550,"libraryId":5,"type":473,"typeLabel":474,"stem":551,"options":552,"answer":503,"analysis":33},987703,"PDPC法可用于多种场合，其中包括（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"确定解决问题的关键线路",{"key":24,"text":556,"correct":29},"系统设计时对整个系统的故障进行预测",{"key":27,"text":558,"correct":29},"编写周密的过程控制方案",{"key":31,"text":560,"correct":29},"预测销售过程可能出现的问题并考虑对策",{"key":486,"text":562,"correct":22},"制定进度计划",{"id":564,"libraryId":5,"type":473,"typeLabel":474,"stem":565,"options":566,"answer":577,"analysis":33},987704,"关于PDPC法的说法，正确的有（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":29},"PDPC法可从全局、整体上掌握系统的状态",{"key":24,"text":570,"correct":29},"PDPC法可按时间顺序掌握系统的进展情况",{"key":27,"text":572,"correct":29},"PDPC法能掌握产生非理想状态的原因",{"key":31,"text":574,"correct":22},"PDPC图一经确定不能改变",{"key":486,"text":576,"correct":29},"PDPC法可补充过去没有想到的措施","ABCE",{"id":579,"libraryId":5,"type":473,"typeLabel":474,"stem":580,"options":581,"answer":592,"analysis":33},987705,"可根据网络图计算各工序的（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":29},"最早开工时间",{"key":24,"text":585,"correct":22},"技术难度",{"key":27,"text":587,"correct":29},"最迟开工时间",{"key":31,"text":589,"correct":29},"最早完工时间",{"key":486,"text":591,"correct":29},"最迟完工时间","ACDE",{"id":594,"libraryId":5,"type":473,"typeLabel":474,"stem":595,"options":596,"answer":607,"analysis":33},987706,"网络图的绘制规则包括（ ）。",[597,599,601,603,605],{"key":20,"text":598,"correct":29},"节点的编号不能重复",{"key":24,"text":600,"correct":29},"图中不能存在环",{"key":27,"text":602,"correct":22},"两个节点之间只能有一条线路",{"key":31,"text":604,"correct":22},"只允许有少量的缺口",{"key":486,"text":606,"correct":29},"只能有一个起始节点和一个终点节点","ABE",{"id":609,"libraryId":5,"type":473,"typeLabel":474,"stem":610,"options":611,"answer":622,"analysis":33},987707,"网络图中节点一般用 表示。关于tE和tL的说法，正确的有（）。",[612,614,616,618,620],{"key":20,"text":613,"correct":29},"tE为最早开工时间",{"key":24,"text":615,"correct":29},"tL为最迟完工时问",{"key":27,"text":617,"correct":22},"tE为最早完工时间",{"key":31,"text":619,"correct":22},"tL最迟开工时间",{"key":486,"text":621,"correct":22},"(tE-tL)为最长开工时间","AB",[624,627,630,633,636,639],{"id":15,"name":625,"category":7,"favorite":626},"领导干部任职前廉政法规知识测试题",92,{"id":628,"name":629,"category":7,"favorite":15},595,"建筑结构与设备",{"id":631,"name":632,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":634,"name":635,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":637,"name":638,"category":7,"favorite":8},534,"BIM工程师",{"id":640,"name":638,"category":7,"favorite":8},535]