[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-722-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":682},{"id":5,"name":6,"category":7,"favorite":8},722,"中级质量专业理论与实务","建筑工程",0,24,50,1518,[13,34,46,58,70,82,93,105,123,138,153,168,178,193,204,219,233,247,262,277,290,302,316,331,345,359,373,384,396,408,420,432,444,456,468,480,492,504,519,533,545,559,570,582,595,610,624,639,653,667],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},987558,1,"单选题","质量改进过程中，“确认效果”时将效果换算成金额的好处在于（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","活动效果可比",false,{"key":24,"text":25,"correct":22},"B","说明该课题的重要度",{"key":27,"text":28,"correct":29},"C","引起企业领导的重视",true,{"key":31,"text":32,"correct":22},"D","让大家重视经济效益","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},987559,"在质量改进过程中，如果分析现状用的是排列图，确认效果时必须用（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"控制图",{"key":24,"text":41,"correct":22},"坐标图",{"key":27,"text":43,"correct":29},"排列图",{"key":31,"text":45,"correct":22},"直方图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},987560,"关于确认效果阶段，下列说法不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"用于改进前后比较的图表最好前后一致",{"key":24,"text":53,"correct":22},"将改进的成果换算成金额会让管理者认识到改进的重要性",{"key":27,"text":55,"correct":29},"只列出改进的主要效果即可，其他小的效果可不计入评价",{"key":31,"text":57,"correct":22},"采取对策后没有出现预期结果时，应从两个角度考虑原因",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},987561,"采取对策后没有出现预期结果时，经确认对策实施均按计划开展，说明对策失效，这时应重新回到（ ）阶段。",[62,64,66,68],{"key":20,"text":63,"correct":22},"选择课题",{"key":24,"text":65,"correct":29},"掌握现状",{"key":27,"text":67,"correct":22},"分析问题原因",{"key":31,"text":69,"correct":22},"拟定对策并实施",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},987562,"为改进工作，应确定5W1 H，5W1H中的“H”的含义是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"谁做",{"key":24,"text":77,"correct":22},"哪里做",{"key":27,"text":79,"correct":29},"如何做",{"key":31,"text":81,"correct":22},"做什么",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},987563,"质量改进中，“实施教育培训”是（ ）步骤的活动内容。",[86,87,89,91],{"key":20,"text":69,"correct":22},{"key":24,"text":88,"correct":22},"确认效果",{"key":27,"text":90,"correct":29},"防止再发生和标准化",{"key":31,"text":92,"correct":22},"总结",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},987564,"( )是表示作业顺序的一种方法。",[97,99,101,103],{"key":20,"text":98,"correct":22},"导入新标准",{"key":24,"text":100,"correct":22},"3W1H",{"key":27,"text":102,"correct":29},"作业标准",{"key":31,"text":104,"correct":22},"4W1H",{"id":106,"libraryId":5,"type":107,"typeLabel":108,"stem":109,"options":110,"answer":122,"analysis":33},987565,2,"多选题","质量改进没有取得预期效果，可能的原因有（ ）。",[111,113,115,117,119],{"key":20,"text":112,"correct":29},"没有按计划实施",{"key":24,"text":114,"correct":29},"计划编制错误",{"key":27,"text":116,"correct":22},"没有对计划实施过程进行合理监控",{"key":31,"text":118,"correct":22},"没有使用控制图",{"key":120,"text":121,"correct":22},"E","没有使用PDPC法","AB",{"id":124,"libraryId":5,"type":107,"typeLabel":108,"stem":125,"options":126,"answer":137,"analysis":33},987566,"PDCA循环的特征包括（ ）。",[127,129,131,133,135],{"key":20,"text":128,"correct":22},"重复的循环",{"key":24,"text":130,"correct":29},"完整的循环",{"key":27,"text":132,"correct":29},"大中套小的循环",{"key":31,"text":134,"correct":29},"逐步上升的循环",{"key":120,"text":136,"correct":22},"交叉进行的循环","BCD",{"id":139,"libraryId":5,"type":107,"typeLabel":108,"stem":140,"options":141,"answer":152,"analysis":33},987567,"下列关于PDCA的内容说法正确的有（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"第一阶段进行规划、申请、提交项目等",{"key":24,"text":145,"correct":29},"第二阶段按计划实地去做，去落实具体对策",{"key":27,"text":147,"correct":22},"第三阶段实施标准化，以后就按标准进行",{"key":31,"text":149,"correct":22},"第四阶段对策实施后，把握对策的效果",{"key":120,"text":151,"correct":29},"第四阶段总结成功的经验，实施标准化以后就按标准进行","BE",{"id":154,"libraryId":5,"type":107,"typeLabel":108,"stem":155,"options":156,"answer":167,"analysis":33},987568,"PDCA中的处置阶段是（ ）",[157,159,161,163,165],{"key":20,"text":158,"correct":29},"肯定成绩",{"key":24,"text":160,"correct":29},"实施标准化",{"key":27,"text":162,"correct":22},"表彰先进",{"key":31,"text":164,"correct":29},"对没有解决的问题转入下一轮解决",{"key":120,"text":166,"correct":22},"实施对策","ABD",{"id":169,"libraryId":5,"type":107,"typeLabel":108,"stem":170,"options":171,"answer":177,"analysis":33},987569,"在质量改进的步骤中，（ ）属于PDCA的A阶段的内容。",[172,173,174,175,176],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":90,"correct":29},{"key":31,"text":67,"correct":22},{"key":120,"text":92,"correct":29},"CE",{"id":179,"libraryId":5,"type":107,"typeLabel":108,"stem":180,"options":181,"answer":192,"analysis":33},987570,"下列关于质量改进的说法正确的有（ ）。",[182,184,186,188,190],{"key":20,"text":183,"correct":29},"质量控制可称为质量维持",{"key":24,"text":185,"correct":22},"通过不断的改进，可将不合格减少为零",{"key":27,"text":187,"correct":22},"不提倡长期地就一个题目开展活动",{"key":31,"text":189,"correct":22},"质量改进的步骤一般分为十个步骤",{"key":120,"text":191,"correct":29},"质量改进是质量管理的一部分，致力于增强满足质量要求的能力","AE",{"id":194,"libraryId":5,"type":107,"typeLabel":108,"stem":195,"options":196,"answer":203,"analysis":33},987571,"质量改进的步骤分为：选择课题，掌握现状，( )和总结。",[197,198,199,200,201],{"key":20,"text":67,"correct":29},{"key":24,"text":69,"correct":29},{"key":27,"text":88,"correct":29},{"key":31,"text":90,"correct":29},{"key":120,"text":202,"correct":22},"识别客户需求","ABCD",{"id":205,"libraryId":5,"type":107,"typeLabel":108,"stem":206,"options":207,"answer":218,"analysis":33},987572,"企业需要改进的问题有很多，经常提到的不外乎是（ ）方面。",[208,210,212,214,216],{"key":20,"text":209,"correct":29},"质量",{"key":24,"text":211,"correct":22},"收益",{"key":27,"text":213,"correct":22},"提货期",{"key":31,"text":215,"correct":29},"安全",{"key":120,"text":217,"correct":29},"激励","ADE",{"id":220,"libraryId":5,"type":107,"typeLabel":108,"stem":221,"options":222,"answer":167,"analysis":33},987573,"质量改进中选择课题应注意（ ）。",[223,225,227,229,231],{"key":20,"text":224,"correct":29},"确认最主要原因并说明理由",{"key":24,"text":226,"correct":29},"设定目标值根据充分",{"key":27,"text":228,"correct":22},"应与国家科研计划挂钩",{"key":31,"text":230,"correct":29},"制定改进计划和期限",{"key":120,"text":232,"correct":22},"任何问题都可以",{"id":234,"libraryId":5,"type":107,"typeLabel":108,"stem":235,"options":236,"answer":203,"analysis":33},987574,"掌握现状应抓住问题特征，需调査的要点有（ ）。",[237,239,241,243,245],{"key":20,"text":238,"correct":29},"时间",{"key":24,"text":240,"correct":29},"地点",{"key":27,"text":242,"correct":29},"问题种类",{"key":31,"text":244,"correct":29},"问题特征",{"key":120,"text":246,"correct":22},"操作人员",{"id":248,"libraryId":5,"type":107,"typeLabel":108,"stem":249,"options":250,"answer":261,"analysis":33},987575,"质量改进中要了解把握当前问题的现状，其活动内容有（）。",[251,253,255,257,259],{"key":20,"text":252,"correct":22},"抓住问题的内部因素",{"key":24,"text":254,"correct":22},"抓住问题的外部因素",{"key":27,"text":256,"correct":29},"抓住问题的特征",{"key":31,"text":258,"correct":29},"如要解决质量问题，就要从人、机、料、法、环等各种不同角度进行调査",{"key":120,"text":260,"correct":29},"去现场收集数据中没有包含的信息","CDE",{"id":263,"libraryId":5,"type":107,"typeLabel":108,"stem":264,"options":265,"answer":276,"analysis":33},987576,"在质量改进的“分析问题原因”阶段的活动内容为（ ）。",[266,268,270,272,274],{"key":20,"text":267,"correct":29},"设立假说",{"key":24,"text":269,"correct":22},"计算质量问题损失金额",{"key":27,"text":271,"correct":22},"选定任务负责人",{"key":31,"text":273,"correct":29},"验证假说",{"key":120,"text":275,"correct":22},"对改进活动的费用做出预算","AD",{"id":278,"libraryId":5,"type":107,"typeLabel":108,"stem":279,"options":280,"answer":289,"analysis":33},987577,"验证假说时，常用的统计工具或方法包括（ ）。",[281,282,284,286,288],{"key":20,"text":43,"correct":29},{"key":24,"text":283,"correct":29},"回归分析",{"key":27,"text":285,"correct":29},"方差分析",{"key":31,"text":287,"correct":22},"PDCA",{"key":120,"text":45,"correct":22},"ABC",{"id":291,"libraryId":5,"type":107,"typeLabel":108,"stem":292,"options":293,"answer":218,"analysis":33},987578,"质量改进的步骤中拟定并实施的对策有（ ）。",[294,296,297,298,300],{"key":20,"text":295,"correct":29},"去除现象（结果）",{"key":24,"text":88,"correct":22},{"key":27,"text":273,"correct":22},{"key":31,"text":299,"correct":29},"消除引起结果的原因，防止再发生",{"key":120,"text":301,"correct":29},"隔断因果关系",{"id":303,"libraryId":5,"type":107,"typeLabel":108,"stem":304,"options":305,"answer":137,"analysis":33},987579,"对质量改进的效果要正确确认，其确认的活动内容有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"使用不同的图表将采取对策前后的质量特性值、成本、交货期等进行总结归纳",{"key":24,"text":309,"correct":29},"如果改进的目的是降低不合格品率或降低成本，则要将特性值换算成金额，并与目标值比较",{"key":27,"text":311,"correct":29},"使用同一种图表（如排列图、调査表等）将采取对策前后的质量特性值、成本、交货期等指标进行比较",{"key":31,"text":313,"correct":29},"如果有其他效果，不管大小都要列举出来",{"key":120,"text":315,"correct":22},"确认在何种程度上做到了防止质量问题的再发生",{"id":317,"libraryId":5,"type":107,"typeLabel":108,"stem":318,"options":319,"answer":330,"analysis":33},987580,"确认质量改进效果时，应注意（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":29},"使用同一种图表比较改进前后特性值",{"key":24,"text":323,"correct":22},"换用其他图表比较，验算改进前后效果",{"key":27,"text":325,"correct":29},"如果改进未达预期效果，应检查是否严格按计划实施",{"key":31,"text":327,"correct":29},"如果按计划实施未达预期效果，应回到掌握现状阶段",{"key":120,"text":329,"correct":29},"将改进成果换算成金额会让管理者认识到改进的重要性","ACDE",{"id":332,"libraryId":5,"type":107,"typeLabel":108,"stem":333,"options":334,"answer":276,"analysis":33},987581,"质量改进中，采取对策后没有出现预期效果时，应该考虑（ ）的情况。",[335,337,339,341,343],{"key":20,"text":336,"correct":29},"是否按计划实施",{"key":24,"text":338,"correct":22},"是否将现象与原因的排除区分开",{"key":27,"text":340,"correct":22},"是否按5W1H实施",{"key":31,"text":342,"correct":29},"是否计划有问题",{"key":120,"text":344,"correct":22},"是否重新制定计划",{"id":346,"libraryId":5,"type":107,"typeLabel":108,"stem":347,"options":348,"answer":218,"analysis":33},987582,"在确认计划是否有问题时，计划的问题往往是（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":29},"现状把握不准",{"key":24,"text":352,"correct":22},"对计划的传达或理解有误",{"key":27,"text":354,"correct":22},"没有经过必要的教育培训",{"key":31,"text":356,"correct":29},"对实施效果的测算有误",{"key":120,"text":358,"correct":29},"没有把握住实际拥有的能力",{"id":360,"libraryId":5,"type":107,"typeLabel":108,"stem":361,"options":362,"answer":167,"analysis":33},987583,"解决质量问题时，制订对策并取得成效后，为了防止质量问题再发生，必须做到（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":29},"再次确认5W1H的内容，并将其标准化",{"key":24,"text":366,"correct":29},"进行标准的准备与传达",{"key":27,"text":368,"correct":22},"找出遗留问题",{"key":31,"text":370,"correct":29},"实施教育培训",{"key":120,"text":372,"correct":22},"制定新的目标",{"id":374,"libraryId":5,"type":107,"typeLabel":108,"stem":375,"options":376,"answer":137,"analysis":33},987584,"质量改进在总结阶段的活动内容有（ ）。",[377,378,379,381,383],{"key":20,"text":309,"correct":22},{"key":24,"text":368,"correct":29},{"key":27,"text":380,"correct":29},"考虑解决这些问题后下一步该怎么做",{"key":31,"text":382,"correct":29},"总结本次质量改进活动过程中，哪些问题得到顺利解决，哪些尚未解决",{"key":120,"text":370,"correct":22},{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},987585,"质量改进的组织形式依据改进的主体，可分为（ ）和团队改进两种形式。",[388,390,392,394],{"key":20,"text":389,"correct":22},"组织改进",{"key":24,"text":391,"correct":29},"正规化的组织改进",{"key":27,"text":393,"correct":22},"员工个人的改进",{"key":31,"text":395,"correct":22},"业余组织改进",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":27,"analysis":33},987586,"质量改进组织工作的第一步是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"制定质量改进目标",{"key":24,"text":403,"correct":22},"组建质量改进团队",{"key":27,"text":405,"correct":29},"成立公司的质量委员会",{"key":31,"text":407,"correct":22},"制定改进计划",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":27,"analysis":33},987587,"质量委员会通常由（ ）组成。",[412,414,416,418],{"key":20,"text":413,"correct":22},"企业董事长和部分董事",{"key":24,"text":415,"correct":22},"企业高级管理层的部分成员、中层领导与工人三结合的形式",{"key":27,"text":417,"correct":29},"企业高级管理层的部分成员",{"key":31,"text":419,"correct":22},"企业基层员工参加的，加上部分管理人员",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},987588,"质量改进团队是（ ）组织。",[424,426,428,430],{"key":20,"text":425,"correct":22},"正式",{"key":24,"text":427,"correct":29},"临时性",{"key":27,"text":429,"correct":22},"固定",{"key":31,"text":431,"correct":22},"独立的",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},987589,"为质量改进团队提供资源是（ ）的职责。",[436,438,440,442],{"key":20,"text":437,"correct":22},"最高管理者",{"key":24,"text":439,"correct":29},"质量委员会",{"key":27,"text":441,"correct":22},"管理者代表",{"key":31,"text":443,"correct":22},"QC小组",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":27,"analysis":33},987590,"编制质量改进成果报告是（ ）的职责。",[448,450,452,454],{"key":20,"text":449,"correct":22},"质量管理委员会",{"key":24,"text":451,"correct":22},"高层管理决策者",{"key":27,"text":453,"correct":29},"质量改进团队组长",{"key":31,"text":455,"correct":22},"质量改进团队",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},987591,"下列各项属于质量改进团队组长的职责是（）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"制定质量改进方针",{"key":24,"text":463,"correct":22},"为质量改进团队配备资源",{"key":27,"text":465,"correct":22},"分析问题原因并提出纠正措施",{"key":31,"text":467,"correct":29},"与质量委员会保持联系",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},987592,"关于质量改进团队，下列说法正确的是（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"质量改进团队是一个常设组织",{"key":24,"text":475,"correct":22},"有固定的领导",{"key":27,"text":477,"correct":22},"随改进目标的不一致，质量改进团队的基本组织结构和活动方式也各有不同",{"key":31,"text":479,"correct":29},"组长通常由质量委员会或其他监督小组指定",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},987593,"( )是上层管理者最基本的参与方式。",[484,486,488,490],{"key":20,"text":485,"correct":22},"参与质量改进团",{"key":24,"text":487,"correct":29},"参与质量委员会的工作",{"key":27,"text":489,"correct":22},"参与下级或基层员工的各种活动",{"key":31,"text":491,"correct":22},"参与下级或基层的操作",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},987594,"A公司自去年年初开始实施质量改进工作，为了准确评定员工的报酬，应加进的一项新指标是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"生产成本",{"key":24,"text":499,"correct":22},"生产率",{"key":27,"text":501,"correct":22},"质量目标",{"key":31,"text":503,"correct":29},"持续质量改进指标",{"id":505,"libraryId":5,"type":107,"typeLabel":108,"stem":506,"options":507,"answer":518,"analysis":33},987595,"员工个人参与的改进形式中，最典型的方式有（ ）。",[508,510,512,514,516],{"key":20,"text":509,"correct":29},"合理化建议",{"key":24,"text":511,"correct":22},"参与质量改进团队",{"key":27,"text":513,"correct":29},"技术革新",{"key":31,"text":515,"correct":22},"生产中把好质量关",{"key":120,"text":517,"correct":22},"提高职业素养","AC",{"id":520,"libraryId":5,"type":107,"typeLabel":108,"stem":521,"options":522,"answer":518,"analysis":33},987596,"关于QC小组和六西格玛团队，下列说法正确的有（ ）。",[523,525,527,529,531],{"key":20,"text":524,"correct":29},"QC小组和六西格玛团队是较为典型的质量改进团队形式",{"key":24,"text":526,"correct":22},"六西格玛团队大多是职能部门内部的改进团队",{"key":27,"text":528,"correct":29},"QC小组有职能部门内部的，也有跨职能的",{"key":31,"text":530,"correct":22},"六西格玛管理主要是以自下而行的方式推进的，是群众性的质量改进活动",{"key":120,"text":532,"correct":22},"QC小组活动是以自上而下的方式推进的，属于管理层推动的质量改进活动",{"id":534,"libraryId":5,"type":107,"typeLabel":108,"stem":535,"options":536,"answer":122,"analysis":33},987597,"质量改进的组织有不同的层次，具体可分为（ ）。",[537,538,539,541,543],{"key":20,"text":439,"correct":29},{"key":24,"text":455,"correct":29},{"key":27,"text":540,"correct":22},"质量管理部门",{"key":31,"text":542,"correct":22},"质量检验部门",{"key":120,"text":544,"correct":22},"生产车间",{"id":546,"libraryId":5,"type":107,"typeLabel":108,"stem":547,"options":548,"answer":518,"analysis":33},987598,"质量委员会的基本职责是（ ）质量改进工作并使其制度化。",[549,551,553,555,557],{"key":20,"text":550,"correct":29},"推动",{"key":24,"text":552,"correct":22},"实施",{"key":27,"text":554,"correct":29},"协调",{"key":31,"text":556,"correct":22},"制定",{"key":120,"text":558,"correct":22},"参与",{"id":560,"libraryId":5,"type":107,"typeLabel":108,"stem":561,"options":562,"answer":289,"analysis":33},987599,"质量委员会的主要职责有（ ）。",[563,564,566,567,568],{"key":20,"text":461,"correct":29},{"key":24,"text":565,"correct":29},"参与质量改进",{"key":27,"text":463,"correct":29},{"key":31,"text":465,"correct":22},{"key":120,"text":569,"correct":22},"编写质量改进成果报告",{"id":571,"libraryId":5,"type":107,"typeLabel":108,"stem":572,"options":573,"answer":152,"analysis":33},987600,"质量改进团队组长的职责包括（ ）。",[574,576,577,578,580],{"key":20,"text":575,"correct":22},"编写质量改进活动计划",{"key":24,"text":467,"correct":29},{"key":27,"text":461,"correct":22},{"key":31,"text":579,"correct":22},"制定改进团队有关奖励的规定",{"key":120,"text":581,"correct":29},"安排会议日程",{"id":583,"libraryId":5,"type":107,"typeLabel":108,"stem":584,"options":585,"answer":594,"analysis":33},987601,"质量改进小组成员的职责有（ ）。",[586,587,589,591,592],{"key":20,"text":67,"correct":29},{"key":24,"text":588,"correct":29},"提出建设性建议",{"key":27,"text":590,"correct":29},"提出预防措施",{"key":31,"text":569,"correct":22},{"key":120,"text":593,"correct":29},"将措施标准化","ABCE",{"id":596,"libraryId":5,"type":107,"typeLabel":108,"stem":597,"options":598,"answer":609,"analysis":33},987602,"关于质量改进工作，下列说法正确的有（ ）。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"高质量意味着高成本",{"key":24,"text":602,"correct":29},"质量改进是一项持续改进开展的活动",{"key":27,"text":604,"correct":22},"提高质量只能靠增强检验",{"key":31,"text":606,"correct":29},"质量改进活动应制度化",{"key":120,"text":608,"correct":22},"质量改进只与基层人员有关","BD",{"id":611,"libraryId":5,"type":107,"typeLabel":108,"stem":612,"options":613,"answer":218,"analysis":33},987603,"下列各项属于质量改进障碍的有（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":29},"对质量水平的错误认识",{"key":24,"text":617,"correct":22},"对“低成本就是低质量”的错误认识",{"key":27,"text":619,"correct":22},"忽视员工的素质教育",{"key":31,"text":621,"correct":29},"对失败缺乏正确的认识",{"key":120,"text":623,"correct":29},"对权力下放的错误理解",{"id":625,"libraryId":5,"type":107,"typeLabel":108,"stem":626,"options":627,"answer":638,"analysis":33},987604,"为了持续的开展质量改进，企业的上层管理者“不宜下放”的职责有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"积极参加质量改进活动",{"key":24,"text":631,"correct":29},"批准质量方针和质量目标",{"key":27,"text":633,"correct":22},"积极提出纠正措施",{"key":31,"text":635,"correct":29},"表彰",{"key":120,"text":637,"correct":29},"修改工资及奖励制度","BDE",{"id":640,"libraryId":5,"type":107,"typeLabel":108,"stem":641,"options":642,"answer":518,"analysis":33},987605,"质量改进经常化、制度化要通过（ ）等各项工作来保证。",[643,645,647,649,651],{"key":20,"text":644,"correct":29},"实施高层管理者审核制度（例如：管理评审）",{"key":24,"text":646,"correct":22},"经常开展QC小组活动",{"key":27,"text":648,"correct":29},"使质量改进目标成为年度计划的内容，使质量改进成为职工岗位职责的一部分",{"key":31,"text":650,"correct":22},"灵活应用各种数理统计工具",{"key":120,"text":652,"correct":22},"组织召开各种表扬大会",{"id":654,"libraryId":5,"type":107,"typeLabel":108,"stem":655,"options":656,"answer":666,"analysis":33},987606,"持续质量改进应做到（ ）。",[657,659,661,663,665],{"key":20,"text":658,"correct":29},"制度化",{"key":24,"text":660,"correct":29},"培训",{"key":27,"text":662,"correct":22},"监管",{"key":31,"text":664,"correct":29},"检査",{"key":120,"text":635,"correct":29},"ABDE",{"id":668,"libraryId":5,"type":107,"typeLabel":108,"stem":669,"options":670,"answer":681,"analysis":33},987607,"进度检查的大部分数据来自质量改进团队的报告，通常要求质量改进成果报告明确的内容有（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":22},"改进后的利用率",{"key":24,"text":674,"correct":29},"如果项目成功，预计可取得的成果",{"key":27,"text":676,"correct":29},"实际取得的成果",{"key":31,"text":678,"correct":29},"资本投入及利润",{"key":120,"text":680,"correct":29},"其他方面的收获","BCDE",[683,686,689,692,695,698],{"id":15,"name":684,"category":7,"favorite":685},"领导干部任职前廉政法规知识测试题",92,{"id":687,"name":688,"category":7,"favorite":15},595,"建筑结构与设备",{"id":690,"name":691,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":693,"name":694,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":696,"name":697,"category":7,"favorite":8},534,"BIM工程师",{"id":699,"name":697,"category":7,"favorite":8},535]