[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987914":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987914,722,2,"多选题","在六西格玛策划时，衡量六西格玛项目的标准有（ ）等。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","财务",true,{"key":16,"text":17,"correct":14},"B","企业内部过程",{"key":19,"text":20,"correct":14},"C","学习与增长",{"key":22,"text":23,"correct":24},"D","技术水平",false,{"key":26,"text":27,"correct":24},"E","管理能力","ABC","衡量六西格玛项目的标准可以运用平衡记分卡策略，即充分关注顾客满意和企业经营两个方面，从顾客、财务、企业内部过程和学习与增长四个层面来综合考虑问题。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]