[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987905":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987905,722,2,"多选题","六西格玛项目团队的活动阶段可分为（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","项目识别及选择",true,{"key":16,"text":17,"correct":14},"B","形成团队",{"key":19,"text":20,"correct":21},"C","团队考核",false,{"key":23,"text":24,"correct":14},"D","确定特许任务书",{"key":26,"text":27,"correct":14},"E","培训团队","ABDE","六西格玛项目团队主要的项目活动阶段有：①项目的识别及选择；②形成团队；③确定特许任务书；④培训团队；⑤开始六西格玛改进（DMAIC）并实施解决方案；⑥解决方案的交接。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]