[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987888":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},987888,722,1,"单选题","在DMAIC改进流程中，使改进后的过程程序化并通过有效的监测方法保持过程改进的结果，这是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分析阶段",false,{"key":16,"text":17,"correct":14},"B","改进阶段",{"key":19,"text":20,"correct":14},"C","测量阶段",{"key":22,"text":23,"correct":24},"D","控制阶段",true,"在DMAIC改进流程中，分析阶段A是通过数据分析确定影响输出F的关键Xs， 即确定过程的关键影响因素；改进阶段I是寻找优化过程输出F并且消除或减小关键Xs影响的方案，使过程的缺陷或变异降低；测量阶段M是通过对现有过程的测量，确定过程的基线以及期望达到的目标，识别影响过程输出F的输入Xs，并对量系统的有效性做出评价。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]