[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987843":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987843,722,2,"多选题","关于QC小组活动成果的评审，下列说法错误的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","评审标准由现场评审和发表评审两个部分组成",false,{"key":16,"text":17,"correct":14},"B","现场评审体现了企业领导对QC小组活动的关心和支持",{"key":19,"text":20,"correct":21},"C","企业评审的重心应放在审核成果可获得性上",true,{"key":23,"text":24,"correct":21},"D","现场审核应该做到企业领导者、管理部门和全体员工都参加",{"key":26,"text":27,"correct":21},"E","发表评审的具体发表形式可以根据小组的实际灵活多样","CDE","C项，企业评审的重心应放在审核成果的真实性及有效性上；D项，现场审核不一定要求全体人员的参加，它主要是面向QC小组全体成员，了解他们活动过程的详细情况， 以及他们做出的努力，克服的困难，取得的成绩；E项是关于QC小组成果发表的叙述。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]