[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987841":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987841,722,2,"多选题","在QC小组的组织项目评审中，评审内容有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","QC小组成员对QC小组活动程序的了解情况",false,{"key":16,"text":17,"correct":14},"B","QC小组成员对方法、工具的了解情况",{"key":19,"text":20,"correct":14},"C","每一阶段的活动能否按计划完成",{"key":22,"text":23,"correct":24},"D","要按有关规定进行小组登记和课题登记",true,{"key":26,"text":27,"correct":24},"E","小组活动时，小组成员的出勤情况","DE","除DE两项外，QC小组的组织项目的评审内容还包括小组成员参与分担组内工作的情况。AB两项是QC小组教育项目的评审内容；C项是活动情况与活动记录项目的评审内容。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]