[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987805":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},987805,722,2,"多选题","某车间的质量改进团队对A系列产品的不合格品项目进行改进时做以下工作： 在因果图分析中进行了设立假设，接着，小组应（ ）验证假设的正确性，从而找出主要原因。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应用数据",true,{"key":16,"text":17,"correct":18},"B","用设立假设的材料",false,{"key":20,"text":21,"correct":18},"C","经讨论由多数意见",{"key":23,"text":24,"correct":14},"D","去现场取证","AD","质量改进过程中，考虑原因时，通常通过讨论其理由，并应用数据或去现场来验证假说的正确性。",{"id":6,"name":28,"category":29,"favorite":30},"中级质量专业理论与实务","建筑工程",0]