[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987787":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},987787,722,2,"多选题","某轴承厂1~4月份的顾客投诉和所有的现场检测记录如下：轴承滚齿不合格40项、外观不合格5项、键槽尺寸不合格2项、外径不合格1项、内径不合格1项、长度不合格1项。质量管理部门针对现有质量问题进行改进，请对下列情况进行分析。 改进后为了保持改进成果，可以采取的措施包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对产品抽检采用加严检验",false,{"key":16,"text":17,"correct":18},"B","运用控制图对过程进行监控",true,{"key":20,"text":21,"correct":18},"C","标准化、程序化",{"key":23,"text":24,"correct":18},"D","对有关人员进行培训","BCD","改进过程不是一次性工作，持续开展质量改进，要做到：①使质量改进制度化、标准化、程序化；②对过程进行监控，加强检查；③表彰员工；④对质量改进的成功给予相应的报酬；⑤对有关人员进行培训。",{"id":6,"name":28,"category":29,"favorite":30},"中级质量专业理论与实务","建筑工程",0]