[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987784":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},987784,722,2,"多选题","某轴承厂1~4月份的顾客投诉和所有的现场检测记录如下：轴承滚齿不合格40项、外观不合格5项、键槽尺寸不合格2项、外径不合格1项、内径不合格1项、长度不合格1项。质量管理部门针对现有质量问题进行改进，请对下列情况进行分析。 针对确立的关键改进项目，应进一步（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","测量过程的波动情况",true,{"key":16,"text":17,"correct":14},"B","分析出现质量问题的原因",{"key":19,"text":20,"correct":21},"C","确定关键的责任人，予以惩罚",false,{"key":23,"text":24,"correct":21},"D","分析生产能力","AB","确立关键改进项目之后，轴承厂所有人员都参与讨论波动的原因，并调查滚齿不合格的波动情况，探讨各因素对不合格的影响，分析质量出现问题的原因。通过现场调查和其他方法对各种原因进行验证，找到了主要原因，并制定了对策予以落实。",{"id":6,"name":28,"category":29,"favorite":30},"中级质量专业理论与实务","建筑工程",0]