[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987778":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},987778,722,2,"多选题","某手机生产厂家为了适应市场的需要，开发了一款新的性能更先进、功能更完善的手机，但上市后市场占有率始终达不到预期效果，且顾客抱怨和市场投诉时有发生，手机生产厂领导十分着急，于是决定围绕新手机开展质量改进活动。请回答下列有关质量改进的问题。 质量改进活动遵循PDCA循环，其中策划阶段的主要任务是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","制定手机质量改进方针和目标",true,{"key":16,"text":17,"correct":14},"B","制定改进项目计划书",{"key":19,"text":20,"correct":21},"C","按计划落实具体对策的实施",false,{"key":23,"text":24,"correct":21},"D","总结成功的经验，实施标准化","AB","质量改进活动遵循PDCA循环，其中策划阶段的主要任务是：制定方针、目标、计划书、管理项目等。",{"id":6,"name":28,"category":29,"favorite":30},"中级质量专业理论与实务","建筑工程",0]