[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987766":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987766,722,2,"多选题","流程图的应用程序中在画出流程图草案之前要经历的程序有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","判别过程开始和结束",true,{"key":16,"text":17,"correct":18},"B","确定流程图符号",false,{"key":20,"text":21,"correct":14},"C","设想观察或判断从开始到结束全过程",{"key":23,"text":24,"correct":14},"D","规定过程中的步骤",{"key":26,"text":27,"correct":18},"E","验证流程图","ACD","流程图的应用程序为：①判别过程的开始和结束；②设想、观察或判断从开始到结束的整个过程；③规定在该过程中的步骤（输入、活动、判断、决定、输出）；④画出表示该过程的一张流程图的草图；⑤与该过程的有关人员共同评审该草图；⑥根据评审结果，改进流程图草图；⑦与实际过程比较，验证改进后的流程图；⑧注明正式流程图的形成日期，以备将来使用和参考。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]