[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987725":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987725,722,2,"多选题","排列图中相应的作用可以包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","每个项目的发生次数",true,{"key":16,"text":17,"correct":14},"B","有关每个项目的成本",{"key":19,"text":20,"correct":21},"C","有关每个项目的收益",false,{"key":23,"text":24,"correct":14},"D","影响结果的其他指标",{"key":26,"text":27,"correct":21},"E","每个项目的执行过程","ABD","排列图按下降的顺序显示出每个项目（例如不合格项目）在整个结果中的相应作用。相应作用可以包括发生次数、有关每个项目的成本或影响结果的其他指标。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]