[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987705":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987705,722,2,"多选题","可根据网络图计算各工序的（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","最早开工时间",true,{"key":16,"text":17,"correct":18},"B","技术难度",false,{"key":20,"text":21,"correct":14},"C","最迟开工时间",{"key":23,"text":24,"correct":14},"D","最早完工时间",{"key":26,"text":27,"correct":14},"E","最迟完工时间","ACDE","网络图节点时间值可以根据网络图依次计算各工序最早开工时间、最迟开工时间、最早完工时间、最迟完工时间。",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]