[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987695":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},987695,722,1,"单选题","水平对比法的应用步骤包括：①确定对比的对象；②收集数据；③实施改进；④归纳对比分析数据；⑤选择用来进行水平比较的项目。下列排序正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","①②③④⑤",false,{"key":16,"text":17,"correct":14},"B","①④③⑤②",{"key":19,"text":20,"correct":21},"C","⑤①②④③",true,{"key":23,"text":24,"correct":14},"D","⑤③②④①","",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]