[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987670":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},987670,722,1,"单选题","关于关键线路，下列说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","关键线路是整个工期最短的线路",false,{"key":16,"text":17,"correct":18},"B","关键路线上的活动是影响整个工程进度的主要因素",true,{"key":20,"text":21,"correct":14},"C","关键线路是完成时间上有富裕，有机动时间的线路",{"key":23,"text":24,"correct":14},"D","关键线路是有时差的节点连结成的线路","关键线路是由关键工序组成的。在网络图中，关键路线是所有线路中耗时最长的线路，关键线路上的时间之和是工程所需的时间，称为总工期。由于只有通过压缩关键路线上的活动时间，才能使整个工期缩短，因此关键路线上的活动是影响整个工程进度的主要因素。",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]