[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987662":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},987662,722,1,"单选题","( )的情况下，可用PDPC法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","选择适宜的作业路径",false,{"key":16,"text":17,"correct":14},"B","确定具体的质量改进目标",{"key":19,"text":20,"correct":21},"C","对可能出现的问题提前做好准备",true,{"key":23,"text":24,"correct":14},"D","找出解决问题的主要途径","",{"id":6,"name":27,"category":28,"favorite":29},"中级质量专业理论与实务","建筑工程",0]