[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-987581":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},987581,722,2,"多选题","质量改进中，采取对策后没有出现预期效果时，应该考虑（ ）的情况。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","是否按计划实施",true,{"key":16,"text":17,"correct":18},"B","是否将现象与原因的排除区分开",false,{"key":20,"text":21,"correct":18},"C","是否按5W1H实施",{"key":23,"text":24,"correct":14},"D","是否计划有问题",{"key":26,"text":27,"correct":18},"E","是否重新制定计划","AD","",{"id":6,"name":31,"category":32,"favorite":33},"中级质量专业理论与实务","建筑工程",0]